WorksheetsRevision of Construction Development Process
Total questions: 10
Worksheet time: 5mins
What is the main purpose of the RIBA Plan of Work 2020?
To provide building cost estimates for developers
To serve as a framework for managing all stages of construction projects
To standardize architectural designs across the world
To replace all local building regulations
In the RIBA Plan of Work, Stage 0 (Strategic Definition) focuses on:
Finalizing technical drawings
Constructing the building on site
Analysing strategic options and developing a business case
Preparing detailed tender documentation
The Planning Application is generally submitted at which stage of the RIBA Plan of Work?
Stage 1 – Preparation and Briefing
Stage 2 – Concept Design
Stage 3 – Spatial Coordination
Stage 4 – Technical Design
Which of the following is a core task under Stage 4 – Technical Design?
Preparing the project brief
Preparing building regulations applications and final specifications
Reviewing site feasibility and constraints
Conducting post-occupancy evaluation
What happens during Stage 6 – Handover in the RIBA Plan of Work?
Preparation of concept design
Submission of tender documents
Rectifying defects and reviewing project performance
Conducting feasibility studies
Which of the following correctly lists the five stages of the Construction Development Process?
Feasibility, Design, Construction, Maintenance, Disposal
Inception, Design and Costing, Construction, Occupation, Demolition
Planning, Design, Construction, Handover, Use
Strategic Briefing, Concept, Construction, Operation, Closure
The Inception Stage in the construction development process includes:
identifying project needs and feasibility
finalizing construction contracts
completing the building structure
conducting post-construction evaluation
Which of the following is the first stage in the construction development process?
Site handover to the contractor
Tender action and evaluation
Appraisal, strategic briefing, and feasibility studies
Preparation of as-built drawings
The purpose of the Tender Action sub-stage is to:
Prepare sketch designs and layout
Invite contractors to submit bids and evaluate tenders
Conduct post-occupancy evaluation
Prepare feasibility studies
Which of the following is NOT one of the main teams involved in the construction development process?
Design Team
Construction Team
Manufacturing Team
Marketing Team