Revision of Construction Development Process

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

What is the main purpose of the RIBA Plan of Work 2020?

a)

To provide building cost estimates for developers

b)

To serve as a framework for managing all stages of construction projects

c)

To standardize architectural designs across the world

d)

To replace all local building regulations

2.

In the RIBA Plan of Work, Stage 0 (Strategic Definition) focuses on:

a)

Finalizing technical drawings

b)

Constructing the building on site

c)

Analysing strategic options and developing a business case

d)

Preparing detailed tender documentation

3.

The Planning Application is generally submitted at which stage of the RIBA Plan of Work?

a)

Stage 1 – Preparation and Briefing

b)

Stage 2 – Concept Design

c)

Stage 3 – Spatial Coordination

d)

Stage 4 – Technical Design

4.

Which of the following is a core task under Stage 4 – Technical Design?

a)

Preparing the project brief

b)

Preparing building regulations applications and final specifications

c)

Reviewing site feasibility and constraints

d)

Conducting post-occupancy evaluation

5.

What happens during Stage 6 – Handover in the RIBA Plan of Work?

a)

Preparation of concept design

b)

Submission of tender documents

c)

Rectifying defects and reviewing project performance

d)

Conducting feasibility studies

6.

Which of the following correctly lists the five stages of the Construction Development Process?

a)

Feasibility, Design, Construction, Maintenance, Disposal

b)

Inception, Design and Costing, Construction, Occupation, Demolition

c)

Planning, Design, Construction, Handover, Use

d)

Strategic Briefing, Concept, Construction, Operation, Closure

7.

The Inception Stage in the construction development process includes:

a)

identifying project needs and feasibility

b)

finalizing construction contracts

c)

completing the building structure

d)

conducting post-construction evaluation

8.

Which of the following is the first stage in the construction development process?

a)

Site handover to the contractor

b)

Tender action and evaluation

c)

Appraisal, strategic briefing, and feasibility studies

d)

Preparation of as-built drawings

9.

The purpose of the Tender Action sub-stage is to:

a)

Prepare sketch designs and layout

b)

Invite contractors to submit bids and evaluate tenders

c)

Conduct post-occupancy evaluation

d)

Prepare feasibility studies

10.

Which of the following is NOT one of the main teams involved in the construction development process?

a)

Design Team

b)

Construction Team

c)

Manufacturing Team

d)

Marketing Team