3. Introduction to Power Supply Installations

Total questions: 15

Worksheet time: 8mins

Name
Class
Date
1.

Expand the term SWS

a)

Secondary Station

b)

Switching Station

c)

Sectioning Switching Station

d)

Sectioning Wire Station

2.

Output voltage of a Scott-connected transformer is

a)

66 KV

b)

110 KV

c)

132 KV

d)

50 KV

3.

Where is the neutral section provided?

a)

SSP

b)

AT

c)

Nowhere required

d)

SP

4.

Generally, the sub-sector is between ____ & ____

a)

ATP & SSP

b)

Gantry & Isolator

c)

TSS & SSP

d)

SSP & Isolator

5.

In EDFC projects, 'V'-connected transformers are provided for the power supply in TSS.

a)

True

b)

False

6.

Parallel interrupters are provided for extending the UP & DN line power supply.

a)

True

b)

False

7.

Protection of Transformer in TSS is by

a)

Transformer CB

b)

Feeder CB

c)

Interrupters

d)

Auto Transformer

8.

The third rail system typically operates at

a)

1500 V DC

b)

750 V DC

c)

25 kV AC

d)

2 x 25 kV AC

9.

First aid boxes and shock treatment charts are provided at switching stations.

a)

False

b)

True

10.

Voltage system used for Bullet Train OHE is

a)

25 kV AC

b)

2 × 25 kV AC

c)

1500 V DC

d)

750 V DC

11.

Interrupters are operated by

a)

Both manually and remote control

b)

Remote control

c)

Through Wi-Fi

d)

Manually

12.

Identify the equipment.

a)

LA

b)

Isolator

c)

PT

d)

CB

13.

RTU is provided in the Station Master Room.

a)

False

b)

True

14.

Lightning arresters are also called surge diverters.

a)

True

b)

False

15.

The output DC voltage in a SSP is 48V.

a)

False

b)

True