wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

summer 25 exam

Total questions: 34

Worksheet time: 11mins

Name
Class
Date
1.

Which planning method visually schedules tasks across a timeline and is commonly used to plan engineering projects?

a)

Critical Path Analysis (CPA)

b)

Gantt chart

c)

Formal meetings

d)

Standard operating procedure (SOP)

2.

Which technique focuses on identifying the longest sequence of dependent tasks to determine a project’s minimum completion time?

a)

Project Evaluation Review Technique (PERT)

b)

Gantt chart

c)

Critical Path Analysis (CPA)

d)

Formal meeting notes

3.

Which is a valid reason for monitoring equipment as part of maintenance?

a)

To increase unplanned downtime

b)

To identify changes in performance over time

c)

To avoid documenting faults

d)

To replace equipment more frequently regardless of condition

4.

Which activity is part of the rail engineering industry?

a)

Designing and manufacturing new trains/parts

b)

Maintaining aircraft avionics

c)

Offshore oil well drilling

d)

Road tunnel toll collection

5.

On an engineering drawing, what does the abbreviation R typically stand for?

a)

Radius

b)

Roughness

c)

Reference

d)

Reverse

6.

On an engineering drawing, what does the abbreviation THD indicate?

a)

Through-hole diameter

b)

Thread

c)

Thermal dissipation

d)

Third-angle drawing

7.

Which employee action best demonstrates a health and safety responsibility in an engineering workplace?

a)

Working safely to avoid injury to self and others

b)

Modifying PPE to make it more comfortable

c)

Attempting tasks without authorisation to learn faster

d)

Ignoring damaged safety equipment if it still works

8.

Why should a project be reviewed during its lifecycle? Choose the best reason.

a)

To increase initial budget automatically

b)

To assess performance against goals and keep the project on track

c)

To replace stakeholders regularly

d)

To stop accountability processes

9.

Which is an advantage of fully automated manufacturing?

a)

Greater downtime costs from breakdowns

b)

High production efficiency since machines don’t need breaks

c)

Lower product reliability due to more defects

d)

Reduced precision and repeatability

10.

Which is a limitation of fully automated manufacturing?

a)

Lower initial investment needed

b)

Increased flexibility to sudden design changes

c)

Reduction in staffing costs

d)

High initial cost due to purchasing automated equipment

11.

What is the primary function of an active actuator in a control system?

a)

Stores data for later analysis

b)

Uses an external energy source to convert a power signal into force or movement

c)

Measures temperature for feedback

d)

Transmits wireless signals between sensors

12.

Which statement best explains a key advantage of digital signals compared to analogue?

a)

Digital signals are more prone to noise because they are continuous

b)

Digital signals are more resistant to interference due to discrete/binary values

c)

Digital signals cannot be encrypted easily

d)

Digital signals cannot be compressed

13.

An employee notices that their PPE is damaged. What is the responsible action?

a)

Continue working because some protection remains

b)

Report it and avoid using damaged PPE

c)

Lend it to a colleague

d)

Remove safety guards to compensate

14.

During planned maintenance on a high-voltage electrical storage system, which legislation specifically aims to prevent injury or electrocution from electrical equipment?

a)

Provision and Use of Work Equipment Regulations

b)

Electricity at Work Regulations

c)

Control of Substances Hazardous to Health

d)

Personal Protective Equipment Regulations

15.

Which control measure best ensures energy sources are isolated before servicing an electrical system?

a)

Risk assessment

b)

Permit to work

c)

Lock out tag out (LOTO)

d)

Reporting faults to a supervisor

16.

Which pair of engineering drawings would most directly help a technician connect components correctly and understand the physical wire layout during recommissioning?

a)

Orthographic drawing and exploded view

b)

Circuit diagram and wiring diagram

c)

Schematic and orthographic drawing

d)

Exploded view and schematic

17.

For a firm buying 10 parts from a single supplier and assembling metal door handles, which is an advantage of adopting just-in-time (JIT) inventory?

a)

Higher rental costs for storage

b)

Less rental cost because parts arrive only when required

c)

Increased safety stock levels

d)

Slower cash flow due to frequent purchases

18.

An industry placement where staff spend time at another company can improve performance primarily by which outcome?

a)

Reducing the need for training altogether

b)

Gaining new skills and insights by observing and participating in activities

c)

Eliminating quality inspections on return

d)

Guaranteeing salary increases for staff

19.

Which statement best defines the role of augmented reality (AR) in the context of manufacturing one-off jewellery pieces?

a)

AR replaces manual tools with fully automated machines.

b)

AR overlays digital information onto the real world to support manual processes.

c)

AR is a technology that only creates fully virtual environments with no view of the real world.

d)

AR is a database system for storing customer orders.

20.

A workshop produces bespoke jewellery, with each piece requiring unique steps. Which AR application most directly helps workers follow these varying processes accurately?

a)

Using AR to display generic company advertisements on the shop floor.

b)

Using AR to overlay step-by-step instructions tailored to each individual item.

c)

Using AR to automatically machine every component without human input.

d)

Using AR to change the alloy composition of metals in real time.

21.

Which use of AR most clearly supports quality control for one-off jewellery manufacture?

a)

Overlaying a playlist to improve worker morale.

b)

Projecting inspection requirements and measurement methods, such as how to take external measurements with a Vernier calliper.

c)

Displaying the company’s annual sales graph next to the bench.

d)

Streaming a live sports event during work hours.

22.

A company wants to reduce safety incidents when using manually operated drilling and cutting tools for bespoke jewellery. Which AR feature would best address this goal?

a)

AR overlay showing health and safety guidance and correct tool use.

b)

AR simulation that hides all real-world views to focus on virtual objects only.

c)

AR feature that tracks inventory levels of finished products.

d)

AR overlay that shows customer reviews during production.

23.

In the context of plastic water bottle manufacturing, which statement best describes the primary purpose of value stream mapping (VSM)?

a)

To design new bottle shapes for marketing appeal

b)

To create a virtual map of the actual production process to identify waste

c)

To schedule staff holidays to reduce overtime

d)

To replace quality control testing with automation

24.

Which of the following is a specific benefit of preparing a future state map in VSM for bottle production?

a)

It guarantees zero defects without further action

b)

It shows the ideal version of the process, guiding steps needed to reach it

c)

It eliminates the need for shipping activities

d)

It increases the distance materials move within the organisation

25.

When applying VSM to the bottle process, which data would most directly help reduce waiting and motion waste?

a)

Time needed for each activity and changeover/waiting times

b)

Employee satisfaction survey scores

c)

Annual sales revenue

d)

Supplier brand names

26.

Quality control information within a VSM for bottles is MOST likely to include which pair?

a)

Advertising costs and market share

b)

Number of labels printed and bottle colour

c)

Time taken for inspections and count of non-conforming bottles at each stage

d)

Office floor area and number of meeting rooms

27.

Which statement best describes the purpose of contracts in engineering organisations?

a)

To advertise products and services to new clients

b)

To formalise legal obligations with employees, suppliers, and customers and ensure terms are adhered to

c)

To eliminate the need for tools, equipment, and workforce planning

d)

To guarantee that tenders will always be successful

28.

An engineering firm is preparing a bid to secure work ahead of competitors. Which legal practice is primarily involved?

a)

Tendering

b)

Warranties

c)

Indemnity

d)

Force majeure

29.

A product fails during the warranty period. According to legal practices described, what should the organisation ensure it can do?

a)

Issue a force majeure notice to avoid liability

b)

Repair, replace, or refund the product and have operational capacity to deliver this

c)

Cancel the underlying contract without consequence

d)

Shift all risk to the customer through an indemnity

30.

Which clause is used within contracts to provide protection when an uncontrollable event disrupts production, such as a natural disaster?

a)

Warranty clause

b)

Indemnity clause

c)

Force majeure clause

d)

Confidentiality clause

31.

Which statement best defines a Standard Operating Procedure (SOP) in the context of manufacturing and assembly?

a)

A checklist of optional tips for experienced workers

b)

A set of step-by-step instructions to assist workers in carrying out operations

c)

A high-level company mission statement about quality

d)

A document used only for auditing after production

32.

In assembling a mechanical pulley system for lifts, which use of SOPs most directly supports consistency and correct use of equipment?

a)

Providing step-by-step instructions for using specific tools and aligning components to a drawing or specification

b)

Allowing each worker to choose their preferred assembly sequence

c)

Focusing only on post-assembly inspection

d)

Relying on informal peer advice instead of documentation

33.

Which example shows SOPs contributing primarily to safety during manufacturing operations?

a)

Specifying torque values for fasteners

b)

Detailing safe use of tools and equipment to prevent harm to workers

c)

Listing customer delivery dates

d)

Explaining how to calculate sales margins

34.

Why might SOPs reduce downtime of lifts that use pulley systems?

a)

They eliminate the need for training

b)

They ensure pulley systems are assembled to correct quality and safety standards, reducing reactive maintenance

c)

They replace the need for any inspections

d)

They speed up shipping logistics