Brickwork, Setting Out, and Site Testing Worksheet (Grade 13)

Total questions: 18

Worksheet time: 9mins

Name
Class
Date
1.

The standard size of a brick used in construction is ____ cm × ____ cm × ____ cm.

a)

19 × 9 × 9

b)

20 × 10 × 10

c)

23 × 11 × 7

d)

18 × 8 × 8

2.

The right‑angle triangle method used in setting out by tape is the ____ method.

a)

Diagonal

b)

3‑4‑5

c)

Offset

d)

Traverse

3.

The vertical alignment of a constructed wall is checked using a ____.

a)

Plumb bob

b)

Measuring tape

c)

Water level

d)

Mason’s square

4.

The shape and size uniformity test of bricks checks for ____ edges and surfaces.

a)

Rounded

b)

Sharp

c)

Chamfered

d)

Irregular

5.

The material ratio for cement mortar mix in brick wall construction is generally 1 part cement to ____ parts sand.

a)

3

b)

4

c)

5

d)

6

6.

The process of transferring the building plan to the ground is called ____.

a)

Levelling

b)

Setting out

c)

Profiling

d)

Scaffolding

7.

In the 3‑4‑5 method, the right angle is formed at the point where the sides measure ____.

a)

3 units, 4 units, 5 units

b)

2 units, 3 units, 4 units

c)

1 unit, 1 unit, √2 units

d)

6 units, 8 units, 10 units

8.

The water absorption of good‑quality bricks should not exceed ____% of their dry weight.

a)

10

b)

15

c)

20

d)

25

9.

The Flemish bond consists of alternate ____ and ____ in each course.

a)

Stretchers and stretchers

b)

Headers and headers

c)

Headers and stretchers

d)

Quoins and closers

10.

During the water absorption test for bricks, the percentage of water absorbed should not exceed ____% of the dry weight of the brick.

a)

10

b)

15

c)

20

d)

25

11.

Define setting out.

a)

Marking the location of building components on the ground from the plan

b)

Checking the verticality of walls during construction

c)

Mixing concrete to the specified ratio

d)

Estimating the project budget

12.

Which of the following are commonly used tools for setting out? Select all that apply.

a)

Measuring tape

b)

Ranging rods and pegs

c)

Cross staff

d)

Plumb bob

e)

Theodolite/total station

13.

A baseline of 5 m and an offset of 50 cm are used to set out a two‑roomed building. Which description best states how the reference points should be established?

a)

Mark corners along the 5 m baseline only, without offsets

b)

Set a line parallel to the 5 m baseline at 0.5 m outside the wall lines and fix corner pegs using a right‑angle method (such as 3‑4‑5)

c)

Use only a water level to mark all points without measuring distances

d)

Place pegs randomly and adjust during bricklaying

14.

Mention one precaution to ensure accuracy during setting out.

a)

Avoid checking diagonals to save time

b)

Re‑check all measurements, levels, and diagonals before excavation

c)

Place pegs loosely so they can be moved later

d)

Skip baseline establishment

15.

A room measures 2 m × 3 m with a height of 3 m. Calculate the perimeter of the room.

a)

8 m

b)

10 m

c)

12 m

d)

14 m

16.

Why is it important to check the verticality of a wall during construction?

a)

It reduces the amount of mortar required only

b)

It improves structural stability and aesthetics and prevents leaning or cracking

c)

It speeds up the curing process

d)

It eliminates the need for reinforcement

17.

A mason says bricks should be soaked before laying; another says dry bricks are better to avoid weak joints. Which is correct?

a)

Dry bricks are better because they absorb water from mortar

b)

Bricks should be soaked so they do not draw water from the mortar, ensuring proper hydration and bond

c)

Either is fine; it makes no difference

d)

Bricks should be soaked only after laying

18.

Why must construction materials like bricks and cement be tested on site rather than relying solely on supplier‑provided certificates?

a)

Site tests are cheaper than certificates

b)

Certificates are never accurate

c)

Site‑specific storage, handling, and environmental conditions can affect material properties and must be verified

d)

Testing is only needed for legal compliance, not quality