1.

When the technical sanction estimate exceeds or is likely to exceed by more than 5%, which type of estimate is prepared?

a)

Supplementary estimate

b)

Revised estimate

c)

Detailed estimate

d)

Maintenance estimate

2.

If the remaining cost of a work is less than 95% of the original sanctioned cost, the type of estimate prepared is —

a)

Supplementary estimate

b)

Supplementary and Revised estimate

c)

Cubical content estimate

d)

Maintenance estimate

3.

Which of the following measurements is expressed in running meters?

a)

Earthwork excavation

b)

Brickwork

c)

Galvanized iron piping

d)

Concrete flooring

4.

When calculating capitalized value of a building, it equals —

a)

Gross income × Year’s purchase

b)

Net income × Year’s purchase

c)

Annual rent × Sinking fund

d)

Net income × 100 / Depreciation rate

5.

Which among the following does not form part of “outgoings” in valuation?

a)

Sinking fund

b)

Repairs and taxes

c)

Interest on capital investment

d)

Loss of rent

6.

In plinth area method, the internal dimensions of the building are used for cost estimation.

a)
True
b)
False
7.

For stone shelves or kitchen slabs, measurement is taken in square meters instead of cubic meters.

a)
True
b)
False
8.

Assertion (A): In valuation, net income is always less than gross income.
Reason (R): Because taxes, repairs, and other outgoings are deducted from the gross income.

a)

Both A and R are true, and R is the correct explanation of A

b)

Both A and R are true, but R is not the correct explanation

c)

A is true, R is false

d)

Both A and R are false

9.

The estimate prepared when additional works are required to supplement the original work is called (a)   .

10.

In the MKS system, the unit of measurement for reinforced cement concrete work is (a)   .

11.

In valuation, the value at the end of utility period without dismantling is known as (a)   .

12.

The fund created to replace a wasting asset or repay debt gradually is called (a)   .

13.

The method of estimation most suitable for multistoried buildings is (a)   .

14.

Match the following

a)

Preliminary Estimate

1.

Based on cost per unit area or volume

b)

Detailed Estimate

2.

Includes detailed drawings, report, and

c)

Supplementary Estimate

3.

Used when additional works are added

d)

Revised Estimate

4.

Prepared when deviation >5% of cost

15.

Match the following

a)

Gross Income

1.

Total income before deductions

b)

Outgoings

2.

Expenses like taxes and maintenance

c)

Net Income

3.

Net income × Year’s purchase

d)

Capitalized Value

4.

Legal possession of property