wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Quality Awareness Week – Moderate Level Quiz

Total questions: 30

Worksheet time: 20mins

Name
Class
Date
1.

What does ISO stand for?

a)

International Standards Organization

b)

Internal System Operations

c)

Industrial Safety Organization

d)

Institute of Standard Operations

2.

Which of the following is a principle of Total Quality Management (TQM)?

a)

Customer focus

b)

Profit maximization

c)

Short-term goals

d)

Top-down communication

3.

Kaizen refers to:

a)

Rapid prototyping

b)

Continuous improvement

c)

Benchmarking

d)

Employee rewards

4.

Which tool is used for identifying root causes of problems?

a)

Pareto chart

b)

Ishikawa diagram

c)

Control chart

d)

Histogram

5.

What does Six Sigma primarily focus on?

a)

Reducing defects

b)

Increasing production

c)

Employee welfare

d)

Marketing efficiency

6.

Who is considered the father of Quality Control?

a)

Elton Mayo

b)

W. Edwards Deming

c)

Abraham Maslow

d)

Frederick Taylor

7.

The PDCA cycle stands for:

a)

Plan, Do, Check, Act

b)

Prepare, Deliver, Control, Adjust

c)

Plan, Develop, Create, Apply

d)

Process, Design, Control, Analyze

8.

Benchmarking is the process of:

a)

Comparing with best practices

b)

Setting internal standards

c)

Measuring customer loyalty

d)

Estimating future costs

9.

What does ‘defect’ mean in quality terms?

a)

A product not meeting specifications

b)

An incomplete document

c)

An unplanned expense

d)

An overproduced unit

10.

Which ISO standard focuses on Quality Management Systems?

a)

ISO 9001

b)

ISO 45001

c)

ISO 27001

d)

ISO 14001

11.

The ‘Voice of the Customer’ refers to:

a)

Customer complaints only

b)

Customer expectations and feedback

c)

Survey data alone

d)

Product testing

12.

Control charts are used to:

a)

Detect process variation

b)

Improve customer service

c)

Plan financial budgets

d)

Document training

13.

Which of these is NOT a quality tool?

a)

Check sheet

b)

Histogram

c)

Fishbone diagram

d)

Gantt chart

14.

Which of these best defines Quality Assurance?

a)

A. A process to prevent defects

b)

B. A process to detect defects

c)

C. An audit process

d)

D. A production plan

15.

In Six Sigma, the term DPMO stands for:

a)

Defects Per Million Opportunities

b)

Defective Product Measurement Output

c)

Design Process Monitoring Objective

d)

Data Process Management Office

16.

Customer satisfaction depends most on:

a)

Meeting expectations

b)

Price discounts

c)

Advertising

d)

Company size

17.

‘Right first time’ means:

a)

Reducing rework

b)

Ignoring feedback

c)

Increasing production speed

d)

Delegating work

18.

Which of the following is a preventive quality measure?

4 lines
19.

Which statement about quality cost is true?

a)

Prevention costs are cheaper than failure costs

b)

Failure costs are lower than prevention costs

c)

Quality costs can't be measured

d)

All costs are equal

20.

The 'Fishbone diagram' is also known as:

a)

Ishikawa diagram

b)

Pareto chart

c)

Control chart

d)

Flow chart

21.

In ISO 9001, the term 'Non-conformance' refers to:

a)

A deviation from requirements

b)

A new improvement

c)

A product recall

d)

A customer complaint

22.

The primary goal of Quality Control is to:

a)

Identify and fix defects

b)

Market new products

c)

Increase salaries

d)

Create policies

23.

Which of these is part of 5S methodology?

a)

Seiri

b)

SIPOC

c)

Scrum

d)

Sigma

24.

What does QMS stand for?

a)

Quality Management System

b)

Quality Measurement Standard

c)

Qualified Manufacturing Setup

d)

Quick Monitoring System

25.

A control chart's central line represents:

a)

The process average

b)

The highest value

c)

The lowest value

d)

The target value only

26.

What is the main purpose of internal audit in quality systems?

a)

Ensure compliance and improvement

b)

Find faults with employees

c)

Reduce documentation

d)

Delay certification

27.

Continuous improvement is best achieved through:

4 lines
28.

Which term represents the cost of rework and scrap?

a)

Internal failure cost

b)

Prevention cost

c)

Appraisal cost

d)

External failure cost

29.

'Do it right the first time' principle is associated with:

a)

Crosby

b)

Deming

c)

Juran

d)

Feigenbaum

30.

Which of these refers to customer-driven quality?

a)

Meeting or exceeding customer expectations

b)

Meeting internal deadlines

c)

Reducing supplier costs

d)

Increasing inspection frequency