WorksheetsLean Manufacturing
Total questions: 5
Worksheet time: 4mins
Name
Class
Date
1.
What is the primary goal of Lean Manufacturing?
a)
Increase equipment usage
b)
Eliminate waste and add customer value
c)
Maximize inventory levels
d)
Reduce employee count
2.
Which of the following is NOT one of the wastes in Lean?
a)
Waiting
b)
Standardization
c)
Motion
d)
Overproduction
3.
In DMAIC, what is the main objective of the Measure phase?
a)
Identify root causes
b)
Define the problem
c)
Collect baseline data
d)
Implement solutions
4.
Which tool is commonly used in the Analyze phase to identify root causes?
a)
Gantt Chart
b)
Fishbone Diagram
c)
Control Plan
5.
What is the main deliverable of the Define phase in DMAIC?
a)
Control Plan
b)
Project Charter
c)
Root Cause HypothesisRoot Cause Hypothesis
d)
Baseline Metrics
100 %
