WorksheetsStop-Call-Wait
Total questions: 5
Worksheet time: 3mins
What is the first step you should take when you detect the problem?
Try to fix the problem quietly
Finish the task before reporting
Inform the team leader at the end of the shift
Stop the process immediately
What is the main goal of implementing Stop - Call - Wait?
To reduce overtime
To empower workers to catch and resolve problem immediately
To avoid recalls and field action
To create detailed defect logs
Stop - Call - Wait is an approach aims to ________ from propagating through the system and reduces waste.
Prevent defect
Allow defects
Accelerate defects
Ignore defects
Which of the following best describes the “Stop” step in Stop-Call-Wait?
The operator continues working while reporting the issue
The operator halts the process immediately when an abnormality is detected
The supervisor stops the entire factory for inspection
The supervisor stops the entire factory for inspection
Which of the following situations requires Stop-Call-Wait activation?
A missing bolt that affects safety
A scheduled maintenance check
A scheduled maintenance check
A top management visit / Genba