1.
IS code specifying Rules for measurement of works
a)
IS 10262
b)
IS 383
c)
IS 1200
d)
IS 269
2.
Pick the correct statement from the following
a)
Steel work is measured in numbers
b)
Earthwork is measured in Sq.m
c)
R.C.C is measured in Cubic meter
d)
All the above
3.
Pick up the right statement regarding deduction in plastering
a)
No deduction made on area of opening exceeding 3 m²
b)
Deductions are made on area of openings of 0.5 m²
c)
Deductions made on one side for area of opening 0.5 m² to 3 m²
d)
Deductions on both sides are made for area of opening of 0.5 m²
4.
Pick up the item of work not included in the plinth area estimate
a)
Wall thickness
b)
Room area
c)
W.C. area
d)
Courtyard area
5.
Size of broken stone used for plain cement concrete for foundation is
a)
20 mm
b)
40 mm
c)
6 mm
d)
12 mm
6.
The quantity of partition walls and honey-comb walls are worked out in
a)
m
b)
m²
c)
m³
d)
Number
7.
While measuring, area measurements are measured to the tolerance of ___
a)
0.1 m²
b)
0.01 m²
c)
0.001 m²
d)
1 m²
8.
A revised estimate is prepared when
a)
When the original sanctioned estimate is exceeded or likely to exceed by more than 5%
b)
When the expenditure on a work exceeds or likely to exceed the amount of administrative sanction by more than 10%
c)
When there are material deviation from the original proposal, even though the cost may be met from the sanctioned amount
d)
All of these
9.
------ estimate is required to decide the financial position and policy for administrative sanction by the competent administrative authority
a)
Detailed estimate
b)
Revised estimate
c)
Approximate estimate
d)
All of the above
10.
Detailed estimate is also known as ____
a)
Rough cost estimate
b)
Approximate estimate
c)
Abstract estimate
d)
Item rate estimate