wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

unti 101 roles and coms

Total questions: 30

Worksheet time: 15mins

Name
Class
Date
1.

Which trade professional is responsible for fitting doors and windows?

a)

Bricklayer

b)

Carpenter

c)

Plumber

d)

Electrician

2.

Who manages health and safety on a construction site?

a)

Site Manager

b)

Joiner

c)

Labourer

d)

Architect

3.

Which role designs building plans?

a)

Architect

b)

Plumber

c)

Site Operative

d)

Electrician

4.

A joiner mainly works with:

a)

Metal structures

b)

Timber components

c)

Concrete blocks

d)

Electrical wiring

5.

Who installs water supply systems?

a)

Electrician

b)

Plumber

c)

Bricklayer

d)

Carpenter

6.

Which role ensures compliance with building regulations?

a)

Building Inspector

b)

Labourer

c)

Painter

d)

Roofer

7.

Who is responsible for laying bricks and blocks?

a)

Bricklayer

b)

Carpenter

c)

Electrician

d)

Plasterer

8.

Which role focuses on electrical installations?

a)

Electrician

b)

Plumber

c)

Joiner

d)

Site Manager

9.

A roofer’s main task is:

a)

Installing flooring

b)

Constructing roofs

c)

Painting walls

d)

Wiring circuits

10.

Who typically mixes and pours concrete?

a)

Labourer

b)

Architect

c)

Electrician

11.

Which of these is a key responsibility of a carpenter?

a)

Installing electrical sockets

b)

Cutting and fitting timber

c)

Mixing mortar

d)

Designing blueprints

12.

A site manager must:

a)

Supervise workers and schedules

b)

Lay bricks

c)

Install plumbing systems

d)

Paint walls

13.

Which role requires knowledge of drainage systems?

a)

Plumber

b)

Electrician

c)

Joiner

d)

Bricklayer

14.

Who checks the quality of construction work?

a)

Building Inspector

b)

Labourer

c)

Carpenter

d)

Roofer

15.

Which job involves creating furniture?

a)

Joiner

b)

Bricklayer

c)

Electrician

d)

Plumber

16.

A plasterer’s main duty is:

a)

Applying plaster to walls and ceilings

b)

Installing doors

c)

Wiring circuits

d)

Mixing concrete

17.

Which role prepares and maintains tools on site?

a)

Labourer

b)

Architect

c)

Electrician

d)

Plumber

18.

Who ensures drawings meet client requirements?

a)

Architect

b)

Site Manager

c)

Bricklayer

d)

Joiner

19.

Which role often works with scaffolding?

a)

Roofer

b)

Electrician

c)

Plumber

d)

Joiner

20.

A painter and decorator is responsible for:

a)

Applying finishes to surfaces

b)

Installing plumbing

c)

Supervising site safety

d)

Mixing mortar

21.

Why is communication important on a construction site?

a)

To reduce material costs

b)

To ensure safety and coordination

c)

To avoid using tools

d)

To speed up painting

22.

Which is an example of verbal communication?

a)

Email

b)

Face-to-face conversation

c)

Text message

d)

Drawing plans

23.

Which method is best for sharing technical drawings?

a)

Phone call

b)

Printed plans

c)

Verbal instructions

d)

Text message

24.

What does non-verbal communication include?

a)

Written reports

b)

Body language and gestures

c)

Phone calls

d)

Emails

25.

Why is listening important in communication?

a)

To ignore instructions

b)

To understand tasks clearly

c)

To avoid teamwork

d)

To reduce paperwork

26.

Which tool is commonly used for formal communication?

a)

Social media

b)

Site notice board

c)

Hand signals

d)

Face-to-face chat

27.

What should you do if instructions are unclear?

a)

Ignore them

b)

Ask for clarification

c)

Continue guessing

d)

Stop working

28.

Which is an example of written communication?

a)

Phone call

b)

Email

c)

Verbal briefing

d)

Hand signals

29.

Why is accurate communication vital for safety?

a)

To avoid mistakes and accidents

b)

To reduce costs

c)

To speed up painting

d)

To avoid paperwork

30.

Which method is best for urgent safety alerts?

a)

Email

b)

Face-to-face or radio communication

c)

Weekly report

d)

Text message only