NAVISWORKS MCQS

Total questions: 5

Worksheet time: 3mins

Name
Class
Date
1.

During a large construction project, Eshaan is tasked with ensuring that all teams are on the same page regarding the design and execution of the project. He decides to use Navisworks to facilitate this process. What is Navisworks primarily used for?

a)

Architectural modeling

b)

Structural analysis

c)

Project review and coordination

d)

Landscape design

2.

Which of the following file formats is a Navisworks published file?

a)

NWC

b)

NWD

c)

NWF

d)

RVT

3.

The Selection Tree shows:

a)

The list of viewpoints

b)

The project timeline

c)

Hierarchy of model elements

d)

Clash report history

4.

Timeliner is used for:

a)

3D modeling

b)

Cost estimation

c)

4D simulation

d)

Rendering

5.

Saved viewpoints store:

a)

Only camera position

b)

Only clash results

c)

Camera view + visibility + redlines

d)

Model geometry