1.

Which of the following combo of potential hazards is associated with back ground prep?

a)

Dusts, falls and cuts

b)

Asphyxiation, dust and falls

c)

Asphyxiation, falls and cuts

d)

Electrocution, Asphyxiation and cuts

2.

Which tool(s) would be used to remove existing plaster by machine?

a)

Power Scraper

b)

Bolster and lump hammer

c)

Screw gun

d)

Hammer and chisel

3.

3 Blockwork wall is to be plastered. It is not clear what type of block it is. How is it possible to identify whether it is a high, medium or low suction background?

a)

Run a hand over the surface of the background

b)

Scratch the surface of the blockwork

c)

Splash some water on the background

d)

Gently tap on the blockwork with a hammer

4.

It is important that the background has a sufficient key to help the plaster?

a)

Set

b)

Bond to it

c)

Spread easier

d)

Dry

5.

The plaster is applied to a background as quickly as it is applied it is drying and crazing. Yet the material in the bucket is still wet. What could be causing this?

a)

Insufficient key

b)

Uncontrolled suction

c)

Faulty material

d)

Too little suction

6.

A bonding agent is used to:

a)

increase adhesion between surfaces

b)

reduce surface tension

c)

act as a cleaning agent

d)

provide insulation

7.

Which of the following tools can be used to clean down a background surface?

a)

1 only

b)

1 and 2

c)

1, 2 and 3

d)

1, 2 and 4

8.

What is the main hazard when mixing Plaster?

a)

Trips

b)

Dust

c)

Electrocution

d)

Slips

9.

What is plasticiser used for when mixing a render coat?

a)

Prevent cracking in the render

b)

Slow down the setting time

c)

Speed up the setting time

d)

Improve the workability of the render

10.

Once work has been completed. How could damage to completed work and surrounding area be avoided?

a)

Cordoned off area

b)

Leave tools scattered around

c)

Ignore the area after completion

d)

Allow unrestricted access

11.

When using a mixing drill for the first time, which info would detail the correct use?

a)

Manufacturers brochure

b)

Programme of works

c)

Safety data sheet

d)

Specifications

12.

Which of the following is the most necessary requirement of a mixing area?

a)

Small room away from other trades

b)

Clear of debris and out the way of other trades

c)

Clear of debris, open and well ventilated

d)

Near a power point

13.

What would the effect of over mixing the plaster when using a mechanical mixer?

a)

Affect the setting time

b)

Increase the chance of delamination

c)

Increase the chance of hairline cracks

d)

Affect the finish of the plaster

14.

An existing wall needs re-plastering as the plaster is loose. Including mandatory P.P.E, which of the following combo of P.P.E would be required while knocking off the plaster?

a)

Overalls, gauntlets, ear plugs and dust mask

b)

Ear plugs, dust mask, gauntlets and goggles

c)

Overalls, gloves and ear plugs

15.

List the safety equipment mentioned in the worksheet.

a)

Googles, gloves, dust mask and ear plugs

b)

Helmet, safety shoes, raincoat and torch

c)

Apron, safety boots, helmet and face shield

d)

Lab coat, safety shoes, helmet and respirator

16.

Why would a dubbing out coat be used when plastering?

a)

To provide a key

b)

To straighten uneven surfaces

c)

Kill the suction

d)

Make the plaster easier to use

17.

Why is it important to keep a clean work area?

a)

The site supervisor requires it

b)

Prevent damage to work

c)

Prevent damage to tools

d)

Prevent accidents