wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Level 2 DEC Vocab

Total questions: 37

Worksheet time: 19mins

Name
Class
Date
1.

Benchmark costing is described as

a)

Initial costing to check budget fit

b)

Final cost after construction ends

c)

Average cost of regional housing

d)

Contingency reserve for risks

2.

BREEAM is

a)

An international sustainability assessment

b)

A national building code for fire safety

c)

A structural load calculation method

d)

A digital modeling file format

3.

A bubble diagram helps a designer to

a)

Plan layout and circulation flow

b)

Calculate roof load capacity

c)

Estimate project life cycle

d)

Draft a legal contract

4.

Which document lists all rooms, their size, purpose, and level?

a)

Schedule of Accommodation

b)

Floorplan schematic

c)

Organogram chart

d)

Gantt chart report

5.

Sustainability means

a)

Reducing resource use

b)

Maximizing construction speed

c)

Using recycled steel only

d)

Meeting luxury specifications

6.

What is protected in conservation areas?

a)

Areas with historic or architectural significance

b)

Only nationally listed buildings

c)

Industrial zones

d)

Vacant sites for redevelopment

7.

What are project constraints?

a)

Limitations or issues with a site or project

b)

Optional features clients may add later

c)

Marketing strategies for the proposal

d)

Aesthetic preferences of designers

8.

Embodied energy in a building material is

a)

CO2 used or created making it

b)

Energy used by lights during use

c)

Power from on-site solar arrays

d)

Heat lost through poor insulation

9.

A Green Belt is

a)

Protected land around cities

b)

Zone for high-density towers

c)

Floodplain for river control

d)

Corridor for wildlife only

10.

Infrastructure in an architectural project mainly includes

a)

Water, sewage, electricity, transport

b)

Interior finishes and furniture

c)

Window glazing and doors

d)

Topsoil and planting

11.

Facilities Management mainly involves

a)

Running a building and maintenance

b)

Designing structural steel frames

c)

Approving planning applications

d)

Producing interior visual renders

12.

RIBA Stages are

a)

Eight design and building stages

b)

Six procurement steps

c)

Four compliance checks

d)

Ten benchmarking levels

13.

An ethical decision in a project evaluates

a)

Whether something is morally good or bad

b)

If the façade faces the correct street

c)

Whether the site is within a Green Belt

d)

If the Gantt chart is up to date

14.

Social impact means

a)

Effects on people

b)

Energy used daily

c)

Money from tourists

d)

Government rules

15.

Environmental impact in a proposal is the

a)

Effect on the planet and habitats

b)

Effect on jobs and training

c)

Effect on property prices

d)

Effect on team communication

16.

CDM regulations in construction aim to

a)

Protect health and safety

b)

Calculate energy efficiency

c)

Define structural loads

d)

Set budget and payment terms

17.

Collaboration means

a)

Working together as a group

b)

Following individual expert judgment

c)

Outsourcing all technical support

d)

Automating procurement decisions

18.

Quality assurance means

a)

Ensuring a building meets standards

b)

Testing only the final façade

c)

Approving contractor payments

d)

Selecting the cheapest materials

19.

Which tool would you use first to check if a project can be done within budget and limits?

a)

Feasibility assessment

b)

Organogram chart

c)

Lux level survey

d)

RIBA stage review

20.

Which pair are used for early concept planning for a new building?

a)

Bubble diagrams and floorplans

b)

Elevations and compliance checks

c)

CDM forms and organograms

d)

Procurement logs and lux meters

21.

Which is most likely a project constraint for a city center hotel?

a)

Limited site footprint and height

b)

Preference for a glassy façade

c)

Desire for local artwork indoors

d)

Idea to add a rooftop garden

22.

To show who reports to whom in a team, you should prepare a

a)

Project organogram

b)

Lighting elevations

c)

Green Belt survey

d)

Embodied energy table

23.

Which item best shows sustainability thinking in design?

a)

Reducing embodied energy in materials

b)

Increasing elevator travel speeds

c)

Adding more decorative features

d)

Extending lobby height for impact

24.

Which term means identifying risks before they happen and taking steps to prevent them?

a)

Risk assessment

b)

Design evaluation

c)

Project audit

d)

User behaviours

25.

What is a hazard in a project?

a)

A dangerous event

b)

A quality checklist

c)

A repair schedule

d)

A client preference

26.

Durability measures which aspect of a building?

a)

How long a building lasts

b)

How quiet rooms are

c)

How many people can enter

d)

How bright the lights are

27.

Which term relates to how well a building meets needs?

a)

Performance

b)

Maintenance

c)

Iteration

d)

Ventilation

28.

User behaviours are

a)

How people use a building

b)

How contractors estimate costs

c)

How materials are transported

d)

How drawings are dimensioned

29.

What is qualitative data in a design study?

a)

Written or non-numerical information

b)

Numbers from performance tests

c)

Financial spreadsheets

d)

Sensor temperature logs

30.

Which option defines quantitative data?

a)

Numerical data

b)

Open comments

c)

Sketches

d)

Photos

31.

Aesthetic impact focuses on which outcome?

a)

How a building's appearance affects people

b)

How budget affects material choices

c)

How schedule affects contractors

d)

How soil type affects foundations

32.

Sensory impact examines which aspect of user experience?

a)

How sound, light, texture, and smell affect people

b)

How seating numbers affect capacity

c)

How drainage systems affect flooding

d)

How parking spaces affect traffic

33.

What is an audit in project review?

a)

The analysis of a particular topic

b)

The demolition of outdated parts

c)

The decoration of interior spaces

d)

The expansion of site boundaries

34.

Which term describes checking if a classroom layout meets student needs?

a)

Suitability

b)

Iteration

c)

Ventilation

d)

Acoustic

35.

An architect conducts an interview with the end user about the lighting in their building. What type of data have they collected?

a)

Qualitative data

b)

Quantitative data

c)

Maintenance logs

d)

Building regulations

36.

A team develops several prototypes to improve a ventilation system. What process is this?

a)

Iteration

b)

Audit

c)

Performance

d)

Aesthetic impact

37.

A museum does an investigation into how people move around their building. What have they investigated?

a)

User behaviours

b)

Aesthetic impact

c)

Acoustic control

d)

Project audit