WorksheetsDiagnostic Exam – PROCRS4
Total questions: 50
Worksheet time: 25mins
According to the Iceberg Theory of accident costs, if a construction company spends $10,000 on direct medical costs and compensation for an injured worker, what is the most likely impact on the company's indirect costs?
Indirect costs will be roughly equal to the direct costs.
Indirect costs will likely far exceed the direct costs.
Indirect costs are negligible and usually covered by insurance.
Indirect costs only apply if the equipment was damaged.
A worker removes a machine guard to speed up a cutting process because the deadline is approaching. According to the Domino Theory of Accident Causation, this specific action represents:
The Injury.
The Unsafe Condition.
The Unsafe Act.
The Social Environment.
In the hierarchy of controls, which of the following scenarios represents the least effective method for controlling a noise hazard on a construction site?
Replacing a loud diesel generator with a quieter electric model.
Moving the generator to a remote corner of the site away from workers.
Installing sound-dampening barriers around the generator.
Issuing earplugs to workers operating near the generator.
You are inspecting a site and notice a pile of oily rags near a welding station. Using the Fire Tetrahedron concept, removing the oily rags eliminates which element to prevent a fire?
Oxygen
Heat
Fuel
Chemical Reaction
Management claims that safety slows down production. Based on OSH principles regarding efficiency and morale, what is the strongest counter-argument?
Safety allows workers to take more breaks.
A safe workplace reduces lost time claims and improves overall workforce efficiency and quality output.
Safety is required by law, so productivity is secondary.
Safety equipment makes workers look more professional.
A mobile crane is set up on a construction site. To ensure maximum stability before lifting a load, what is the critical requirement regarding the outriggers?
They must be extended at least 50%.
They must be fully extended and set upon firm, level ground.
They are optional if the load is light.
They should be placed on wooden blocks regardless of ground condition.
A rigger is preparing to lift a heavy steel beam. He notices the load is not centered under the hook. If he proceeds with the lift, what is the immediate physical consequence?
The crane will immediately overturn.
The load will swing to center itself under the lift point when suspended, potentially striking workers.
The hoist line will snap immediately.
The load will remain stationary but the motor will overheat.
During a crane operation, the signalman loses radio contact with the operator. What is the correct and immediate procedure?
The operator should continue the lift if they have a clear line of sight.
The signalman should run toward the cab to shout instructions.
All operations must stop until communication is re-established.
The operator should switch to autonomous mode.
You are inspecting a wire rope sling and notice several wires are broken. According to standard rejection criteria, when must the rope be removed from service?
When there is 1 broken wire in one rope lay.
When there are 10 broken wires in one rope lay.
When the rope is dirty or rusty.
When the manufacturer's tag is slightly faded but legible.
Why is the "Absolute Limit of Approach" critical when operating cranes near power lines?
To prevent the crane boom from tangling physically with the wires.
To prevent electrical arcing, which can energize the equipment even without physical contact.
To ensure the crane does not block the utility company's maintenance trucks.
To prevent radio frequency interference with the crane's controls.
A tower crane needs to be installed in a tight urban workspace where there is insufficient clearance for a standard jib to rotate without hitting existing buildings. Which type of crane configuration is best?
Hammerhead Crane
Mobile Hydraulic Crane
Luffing Jib Crane
Crawler Crane
When inspecting shackles, you notice a blue discoloration on the metal body. What does this indicate, and what should be done?
It indicates chemical exposure; clean it with solvent.
It indicates heat damage; the shackle must be discarded and replaced.
It indicates the manufacturer's brand coding; it is safe to use.
It indicates cold stress; warm the shackle before use.
Before beginning demolition work on a multi-story building, what is the primary safety requirement regarding utilities?
All electrical and utility services must be cut off or disconnected.
Utilities should be kept running for lighting purposes.
Water lines must be kept open for workers to drink.
Only gas lines need to be disconnected.
In a "Sequential Demolition" technique, how should the structure be taken down?
By weakening key structural members to cause collapse.
By using explosives at the foundation.
By gradual reduction of height in reverse order to its construction.
By removing the ground floor pillars first.
Regarding the storage of explosives on a construction site, which practice is compliant with safety standards?
Storing detonators and dynamite in the same box for efficiency.
Storing explosives in the site office for security.
Storing detonators in a separate magazine from other explosives.
Leaving explosives in the transport vehicle overnight.
A worker needs to access a landing that is 20 feet high using an extension ladder. To comply with the 4:1 rule, how far away from the wall must the base of the ladder be placed?
2 feet
4 feet
5 feet
10 feet
You are inspecting a scaffold and notice the platform has no guardrails. The platform is 3 meters high. Why is this a violation?
Guardrails are only required for aesthetic purposes.
Guardrails are required for all open sides of platforms to prevent falls.
Guardrails are only required if the scaffold is mobile.
Guardrails are optional if workers are skilled.
A worker is using a fall arrest system. He attaches his lanyard to a PVC electrical conduit pipe running along the ceiling. Why is this unsafe?
The pipe might scratch the lanyard hook.
Electrical conduits are not structural members and cannot support the force of a fall (approx. 5000 lbs).
The lanyard is too short for ceiling attachment.
The pipe is slippery.
When using a full-body harness, why is the shock-absorbing lanyard critical?
It allows the worker to bounce back up after a fall.
It extends the reach of the worker.
It reduces the arresting force on the worker's body during a fall.
It acts as a retrieval rope for rescue.
A scaffold is being erected. To ensure the stability of the platform boards, how much should the wood planks extend beyond the end supports?
They should be flush with the support.
They should extend at least 6 inches but not more than 12 inches (unless cleated).
They should extend 3 feet to allow for a walkway.
They do not need to extend; they should be nailed down immediately.
In the JHA process, at what point should you identify the hazards?
After the accident has occurred.
After listing the basic steps of the job.
Before selecting the job to be analyzed.
Only when the DOLE inspector arrives.
You are conducting a Risk Assessment (HIRAC). You identify a hazard with a "High" probability of occurrence and a "High" severity of injury. How should this risk be prioritized?
It can be addressed next month.
It requires immediate attention and control measures.
It is an acceptable risk; no action is needed.
It should be assigned to the new intern to monitor.
A worker is mixing cement and complaining of back pain. In a JHA, this hazard is best categorized under:
Chemical exposure.
Ergonomic/Physical Factors (Manual Handling).
Electrical hazards.
Biological hazards.
When developing recommendations in a JHA, why is "Use PPE" often listed last?
PPE is too expensive.
PPE eliminates the hazard completely.
PPE is the least effective control (last line of defense) as it does not remove the hazard.
PPE is uncomfortable for workers.
Which of the following is an example of an "Administrative Control" in a JHA?
Installing a machine guard.
Substituting a toxic chemical with a safe one.
Rotating workers to limit exposure time to noise.
Wearing ear muffs.
A worker collapses on a hot day while pouring concrete. His skin is hot and dry, and he is confused. This is indicative of Heat Stroke. Which category of occupational disease does this fall under?
Chemical Hazard
Biological Hazard
Physical Hazard (Abnormalities in temperature).
Ergonomic Hazard
The site is generating a massive amount of dust during demolition. What is the most appropriate engineering control to protect the public and workers?
Issue dust masks to the public walking by.
Spray water to suppress the dust at the source.
Put up a "Beware of Dust" sign.
Work only at night.
Regarding noise on a construction site, what is the primary health risk of prolonged exposure without protection?
Occupational Asthma
Occupational Hearing Loss
Decompression Sickness
Dermatitis
Which of the following is NOT considered a biological hazard in a construction site?
Tetanus from rusty nails.
Dengue from stagnant water in tires.
Silica dust from cutting concrete.
Snake bites during site clearing.
To prevent Pedestrian-Vehicle conflict on site, which measure is considered an Engineering Control?
Training drivers on defensive driving.
Installing physical barriers to separate walkways from roads.
Posting speed limit signs.
Telling workers to watch out for trucks.
What is the primary purpose of an accident investigation?
To find the person responsible and fire them.
To complete the paperwork for insurance only.
To determine the root cause and prevent recurrence.
To clean up the accident site quickly.
During an investigation, you discover a worker slipped on oil. "Oil on the floor" is the:
Root Cause.
Direct Cause (Unsafe Condition).
Management Failure.
Basic Cause.
When interviewing a witness to an accident, which approach is most effective?
Interrogate them aggressively to get the truth.
Ask leading questions that imply the answer you want.
Interview them together with other witnesses to save time.
Interview them separately and ask open-ended questions.
Why should an accident scene be secured immediately after caring for the injured?
To prevent the media from taking photos.
To preserve physical evidence for the investigation.
To allow the supervisor to clean up the mess.
To stop work for the rest of the day.
In the "5 Whys" analysis method, if the problem is "Worker slipped on oil," what is the logical next "Why?" question?
Why was the worker clumsy?
Why was the oil on the floor?
Why couldn't he see it?
Why wasn't he wearing boots?
A Safety Officer observes a "High Risk" hazard that presents an imminent danger to life (e.g., workers in a trench about to collapse). What is their immediate authority?
Write a report and submit it next week.
Call DOLE and wait for instructions.
Issue a Stop Work Order (or equivalent immediate corrective action) for that specific activity.
Ask the workers if they feel safe.
When conducting a Toolbox Meeting, which behavior indicates effective communication by the Safety Officer?
Reading the safety manual word-for-word for 30 minutes.
Encouraging worker engagement and asking for their feedback/opinions.
Speaking in technical jargon to sound authoritative.
Arguing with workers who raise concerns.
What is the ideal duration for a routine Toolbox Meeting?
1 hour
10 - 15 minutes
2 minutes
Half a day
As a Safety Officer, you must submit the Annual Work Accident/Illness Exposure Data Report (AEDR). When is the deadline for submission to DOLE?
Every month on the 20th.
Within 24 hours of an accident.
On or before January 20 of the following year.
Anytime during the year.
Who is primarily responsible for the adequacy and proper maintenance of PPE in the workplace?
The DOLE Inspector
The Employee
The Employer
The Safety Supplier
Under the Employees Compensation Program (ECP), the "Increased Risk Theory" allows for compensation when:
The employee willfully injures themselves.
The illness is not in the official list, but the employee can prove work conditions increased the risk of contracting it.
The employee was intoxicated during the accident.
The employee has a pre-existing condition unrelated to work.
Which of the following incidents would NOT be considered compensable under the EC Program?
An injury sustained while performing an official function.
An injury sustained while ministering to personal comfort (e.g., restroom break) at work.
An injury sustained due to notorious negligence or intoxication.
An injury sustained while riding the company shuttle.
An employee loses sight in one eye due to a chemical splash at work. This is categorized as:
Temporary Total Disability
Permanent Partial Disability
Permanent Total Disability
Non-compensable injury
What is the prescriptive period for filing an EC claim with the Systems (SSS/GSIS)?
1 year from the accident.
3 years from the time the cause of action occurred.
10 years from the accident.
There is no deadline.
If an employer fails to record an accident in the EC Logbook, what is the penalty regarding the claim?
The claim is automatically denied.
The employer is liable for 50% of the lump sum equivalent of the income benefit.
The employee must pay a fine.
The safety officer is fired.
A construction site has a deep excavation near a public sidewalk. You have put up "Keep Out" signs, but children still play near the edge. What is the most appropriate additional control?
Put up bigger signs.
Install physical barriers or fencing to physically exclude unauthorized persons.
Hire a guard to shout at them.
Fill the excavation immediately.
You are evaluating a worker for a crane operator position. He has 10 years of experience but no TESDA certificate or LTO license for the equipment. Should you hire him?
Yes, experience is more important than paper.
No, certified operators must have the required LTO license and TESDA certification.
Yes, but pay him less.
Yes, provided he serves a probation period.
A scaffold is being dismantled. Debris is being thrown down from the 4th floor to the ground. What is the safety violation here?
Debris should be lowered by crane or chute, not thrown, unless the area is barricaded and warnings are posted.
The debris should be burned on the 4th floor.
Debris should be thrown only at night.
There is no violation; this is standard practice.
During a site inspection, you see an electrical cord with frayed insulation repaired with duct tape. What is your course of action?
Approve it since it is taped.
Ignore it if it's only 110 volts.
Tag it as "Do Not Use" / "Out of Order" and remove it from service.
Ask the worker to be careful.
You are planning the traffic management for a site. You have a choice between a one-way system and a two-way system for trucks. Which is safer and why?
Two-way, because it's faster.
One-way, because it minimizes vehicle reversing maneuvers which are high risk.
It doesn't matter as long as drivers are skilled.
Two-way, because it saves space.