WorksheetsFinal Trial
Total questions: 15
Worksheet time: 5mins
Who is responsible for Quality?
Project Manager
QA /QC Engineer
Site In charge
All of the above
Who is lakhan
1...2 ka 4
4....2 ka 1
My name is lakhan
All the above.
What do you mean by EW in MAHSR EW-1?
Electrical work
ENGINEER WORK
English word
All the above.
What is the best?
Mithai
Namkeen
Junk food
None of the above
No of PS Staff in EW1 project
150
168
175
199
What is the maximum height of the Swastik universal?
Bada
bahut bada
very small
kuch to hoga
Curing of concrete
Reduce the shrinkage of concrete
Making available water for hydration
Prevents the loss of water by evaporation
All of the above
What is timing of lunch at EW1?
Apni marji se
Sahab ki marji se
Jab bhook lage
No lunch, bahut kaam hai
What sound indicates work is finally happening on site?
Hammering
Grinding
Supervisor shouting
Machine starting
What does the engineer usually check first at site?
Work progress
Material delivery
Safety compliance
Whether tea is available
What is the best way to increase construction productivity?
Better planning
More manpower
Good equipment
Free samosas on site
Tere naam me kon tha?
humne kiya hai
jeevan apna
sara sanam
salman khan
Which building NOT part of traction system
.TSS 🏭
SSP
SP
Guest House
Major advantage of 2×25 kV:
Train solar se chalegi
Fewer substations
Train 25% lambi ho jayegi
Pigeon proof voltage
Why proper drainage needed?
Avoid water logging
Prevent equipment damage
Strong foundation
ALL
