ITEM 103 — Structure Excavation: Description & Requirements

Total questions: 30

Worksheet time: 15mins

Name
Class
Date
1.

A trench for a pipe culvert encounters hard material below grade. What minimum removal depth is required?

a)

150 mm below pipe invert

b)

300 mm below grade surface

c)

200 mm or 2 mm per 100 mm fill

d)

4 mm per 100 mm fill over pipe

2.

Soft, unsuitable foundation soil is found beneath a non-pipe structure footing. What is the correct remediation approach?

a)

Replace with granular fill placed in 150 mm layers

b)

Pour lean concrete to bridge the weak zone

c)

Add geotextile and keep the original soil

d)

Compact the existing soil with heavier rollers

3.

Which activity is typically excluded from payment for structure excavation in roadway projects?

a)

Excavation requiring dewatering pumps

b)

Excavation within surveyed boundaries

c)

Excavation after installing formwork

d)

Excavation performed outside neat lines

4.

For an aggregate subbase, which material requirement set is acceptable?

a)

Fines passing No. 200 exceed No. 40

b)

CBR at least 25% soaked

c)

Soft, weak stone materials

d)

LA Abrasion greater than 50

5.

For Item 202 crushed aggregate base course, which set of material requirements is correct?

a)

Blend of sand, LA Abrasion ≤40, no CBR requirement

b)

Partially crushed, LA Abrasion ≤60, no fractured face, CBR ≥70%

c)

100% crushed, LA Abrasion ≤45, ≥50% one fractured face, CBR ≥80%

d)

Uncrushed gravel, LA Abrasion ≤50, ≤30% fractured face, CBR ≥60%

6.

If embankment is near subgrade shallower than 1.2 m, what additional step is specified?

a)

Install geotextile underlayment

b)

Apply cement stabilization over 50 mm

c)

Remove sod/vegetation and scarify 150 mm

d)

Increase layer thickness to 300 mm

7.

What is the maximum layer thickness for backfill around structures before compaction?

a)

Place in ≤ 100 mm layers

b)

Place in ≤ 150 mm layers

c)

Place in ≤ 200 mm layers

d)

Place in ≤ 250 mm layers

8.

During construction, why is compacting existing ground to 150 mm depth specified when needed?

a)

To improve surface aesthetics

b)

To provide a firm foundation layer

c)

To reduce equipment fuel usage

d)

To increase moisture content

9.

Which activity should occur immediately after laying each pipe section?

a)

Check joint alignment and seating

b)

Install headwalls and wingwalls

c)

Backfill full height at once

d)

Apply external waterproof coating

10.

How is conduit for pipe culverts typically measured for payment?

a)

By linear meter installed

b)

By cubic meter excavated

c)

By number of joints

d)

By square meter of trench

11.

What is the critical backfill zone height above the pipe crown?

a)

Up to 50 mm

b)

Up to 500 mm

c)

Up to 150 mm

d)

Up to 300 mm

12.

What is the description of Item 200 work scope?

a)

Installing storm drain pipes

b)

Surveying and staking

c)

Placing and compacting subbase

d)

Paving with bitumen

13.

Suitable subbase materials include which type?

a)

Hard, durable crushed stone

b)

Peat and organic material

c)

Uniform beach sand

d)

Soft, silty clayey soil

14.

A subbase material with LL 38 and PI 10 should be:

a)

Rejected for LL > 35

b)

Accepted for PI ≤ 12

c)

Accepted for LL ≤ 50

d)

Rejected for PI < 12

15.

For ITEM 202, what fractured face requirement is specified for particles?

a)

≥ 25% with two faces

b)

≥ 50% with one face

c)

≥ 75% with two faces

d)

≥ 90% with one face

16.

Which statement best differentiates ITEM 201 from ITEM 202 in terms of aggregate processing?

a)

ITEM 201 requires natural gravel only

b)

ITEM 201 prohibits fractured faces entirely

c)

ITEM 202 mandates fully crushed aggregate

d)

ITEM 202 allows uncrushed cobbles widely

17.

For a base course, why is PI limited to 6 in ITEM 201?

a)

To enlarge nominal aggregate size

b)

To enhance asphalt bonding

c)

To increase water absorption

d)

To minimize plastic deformation

18.

A supplier offers aggregate with LL 28, PI 7, CBR 82, LA 48. Which item can accept it?

a)

None meets all limits

b)

ITEM 300 surface course

c)

ITEM 202 crushed base

d)

ITEM 201 base course

19.

Which material property directly relates to particle toughness under traffic?

a)

Liquid limit index

b)

Los Angeles Abrasion

c)

California Bearing Ratio

d)

Plasticity index value

20.

Why might ITEM 202 specify LA Abrasion ≤45 compared to ≤50 in ITEM 201?

a)

Payment is by mass not volume

b)

Surface courses require more flexibility

c)

Natural base allows more fines content

d)

Crushed base needs greater durability

21.

Which statement best describes a single bituminous surface treatment?

a)

Two sprays cutback and one aggregate layer

b)

One spray bitumen and one aggregate layer

c)

Two sprays bitumen and two aggregate layers

d)

One spray emulsion and two aggregate layers

22.

Aggregate used must satisfy which property requirement?

a)

Sand equivalent ≥ 80 and clay content ≤ 3%

b)

Polished stone value ≥ 60 and flatness index ≤ 10

c)

Rounded particle shape and water absorption ≤ 1%

d)

Gradation compliance and LA abrasion ≤ 40

23.

Spraying should be avoided when the surface temperature is below

a)

15°C caution value

b)

20°C minimum threshold

c)

10°C absolute minimum

d)

25°C comfort limit

24.

Why adjust spray rates for specific gravity not equal to 2.65?

a)

Aggregate bulk density changes coverage

b)

Binder viscosity increases with SG

c)

Traffic speed depends on SG

d)

Roller pressure is set by SG

25.

During initial curing, the maximum traffic speed should be

a)

Limited to 40 km/h until binder sets

b)

Restricted to 20 km/h at night

c)

Kept at 60 km/h with escorts

d)

Unlimited if lane is swept

26.

Measurement and payment are based on

a)

Liters of emulsion sprayed

b)

Tonnes of bitumen plus aggregate

c)

Square meters of treated area

d)

Hours of equipment operation

27.

Why is pneumatic-tire rolling preferred for chip seals?

a)

Vibration breaks emulsion quickly

b)

Steel drums prevent binder pickup

c)

High static load reduces voids

d)

Kneading embeds chips uniformly

28.

LA abrasion ≤ 40 ensures

a)

High polish for skid resistance

b)

Adequate durability under traffic wear

c)

Maximum absorption for binder retention

d)

Complete immunity to breakage

29.

A double treatment is preferred when

a)

Traffic volumes are extremely low

b)

Binder cost must be minimized

c)

Greater sealing and texture are required

d)

Aggregate supply is limited

30.

Payment by tonne of bitumen plus aggregate encourages

a)

Overuse of binder to earn more

b)

Faster construction regardless of quality

c)

Ignoring specified gradation limits

d)

Accurate material quantity tracking