wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Industrial Automation Mechanical System Assembling

Total questions: 21

Worksheet time: 11mins

Name
Class
Date
1.

Fill in the blank: The first step in the Industrial Automation Mechanical System Assembling process is to _________.

a)

Perform industrial automation mechanical system assembling work.

b)

Prepare industrial automation mechanical system assembling requirements.

c)

Perform industrial automation mechanical system assembling testing.

d)

Prepare industrial automation mechanical system assembling report.

2.

Fill in the blank: The second step in the Industrial Automation Mechanical System Assembling process is to _________.

a)

Perform industrial automation mechanical system assembling work.

b)

Prepare industrial automation mechanical system assembling requirements.

c)

Perform industrial automation mechanical system assembling testing.

d)

Prepare industrial automation mechanical system assembling report.

3.

Fill in the blank: The third step in the Industrial Automation Mechanical System Assembling process is to _________.

a)

Perform industrial automation mechanical system assembling adjustment.

b)

Perform industrial automation mechanical system assembling testing.

c)

Prepare industrial automation mechanical system assembling requirements.

d)

Prepare industrial automation mechanical system assembling report.

4.

Fill in the blank: The fourth step in the Industrial Automation Mechanical System Assembling process is to _________.

a)

Perform industrial automation mechanical system assembling adjustment.

b)

Perform industrial automation mechanical system assembling testing.

c)

Prepare industrial automation mechanical system assembling requirements.

d)

Prepare industrial automation mechanical system assembling report.

5.

Fill in the blank: The fifth step in the Industrial Automation Mechanical System Assembling process is to _________.

a)

Perform industrial automation mechanical system assembling adjustment.

b)

Perform industrial automation mechanical system assembling testing.

c)

Prepare industrial automation mechanical system assembling requirements.

d)

Prepare industrial automation mechanical system assembling report.

6.

Apakah dua (2) kumpulan tugas penyenggaraan?

a)

Penyenggaraan terancang dan penyenggaraan tidak terancang.

b)

Penyenggaraan terancang dan penyenggaraan selepas terancang.

c)

Penyenggaraan terancang dan penyenggaraan sebelum terancang.

d)

Penyenggaraan sebelum terancang dan penyenggaraan tidak terancang.

7.

Yang manakah bukan tanggungjawab pemula?

a)

Menjana arahan kerja.

b)

Menetapkan garis masa dan tarikh awal.

c)

Memastikan sumber yang diperlukan tersedia.

d)

Menentukan keperluan dan spesifikasi sistem dengan jelas.

8.

Apakah fungsi galas?

a)

Mengurangkan geseran.

b)

Menambahkan geseran.

c)

Menambahkan kelajuan.

d)

Mengurangkan kelajuan.

9.

Apakah sistem yang mengeluarkan pelincir dengan tepat dan seragam?

a)

Sistem visual.

b)

Sistem robotik.

c)

Sistem pengeluaran.

d)

Sistem pemasangan.

10.

Apakah fungsi peralatan pada Rajah 1?

a)

Mengikir besi.

b)

Memahat besi.

c)

Memotong besi.

d)

Membuat tanda pada besi.

11.

Mark (✓) for TRUE statements and (X) for FALSE statements in the space provided. Motor elektrik terdiri daripada motor A.T dan motor A.U.

a)

True

b)

False

12.

Mark (✓) for TRUE statements and (X) for FALSE statements in the space provided. Jigsaw sesuai untuk membuat potongan melengkung yang rumit.

a)

True

b)

False

13.

Mark (✓) for TRUE statements and (X) for FALSE statements in the space provided. Robot Kolaboratif boleh bekerjasama dengan manusia.

a)

True

b)

False

14.

Mark (✓) for TRUE statements and (X) for FALSE statements in the space provided. Gerudi tanpa wayar dikuasakan oleh sistem solar.

a)

True

b)

False

15.

Proses pemotongan Oxy merupakan campuran gas bahan api dan oksigen.

a)

True

b)

False

16.

7. Select two (2) types of welding machines from the options below.

a)

Arc welding machine and MIG welding machine

b)

Lathe machine and Milling machine

c)

Drilling machine and Grinding machine

d)

Compressor and Generator

17.

8. The function of a Pick and Place robot is:

a)

to move objects from one location to another

b)

to weld metal parts together

c)

to paint surfaces automatically

d)

to assemble electronic circuits

18.

9. The following are types of belts:

a)

V-belt, Flat belt, Timing belt

b)

Chain belt, Rope belt, Wire belt

c)

Gear belt, Pulley belt, Spring belt

d)

Link belt, Roller belt, Mesh belt

19.

State the function of the following types of PPE. Pelindung muka (Face shield):

a)

To protect the face from flying objects, chemical splashes, or harmful substances.

b)

To protect the feet from sharp objects.

c)

To protect the hands from electrical hazards.

d)

To protect the ears from loud noises.

20.

State the function of the following types of PPE. Penutup telinga (Ear muffs):

a)

To protect the ears from loud noises and prevent hearing loss.

b)

To protect the eyes from dust and debris.

c)

To protect the hands from chemicals.

d)

To protect the feet from falling objects.

21.

State the function of the following types of PPE. But electrical hazard (Electrical hazard boots):

a)

To protect the feet from electrical shocks and hazards.

b)

To protect the hands from chemical burns.

c)

To protect the eyes from dust particles.

d)

To protect the head from falling objects.