Building Tech 3 Final Quiz Part 2

Total questions: 17

Worksheet time: 1hrs 25mins

Name
Class
Date
1.

A construction crew installs temporary molds to shape freshly poured concrete walls and removes them after curing. What system is being used?

a)

Concrete surfacing

b)

Concrete formwork

c)

Masonry veneer

d)

Wall flashing

2.

A residential project uses wall cavities to run electrical wiring and install insulation. Which wall system allows this arrangement?

a)

Masonry bearing walls

b)

Concrete shear walls

c)

Stud wall system

d)

Precast concrete panels

3.

An engineer specifies masonry walls reinforced with steel bars and grout to resist seismic and wind forces. What wall system is this?

a)

Unreinforced masonry

b)

Veneer masonry

c)

Reinforced masonry

d)

Load-bearing stud wall

4.

If a commercial building with a flat roof is located in a region with frequent heavy rainfall, what additional design consideration should be made to prevent water accumulation and leaks?

a)

Use clay tiles for roofing

b)

Increase roof slope and specify continuous membrane roofing

c)

Install timber planks for drainage

d)

Add ceiling finish for water resistance

5.

For a warehouse requiring rapid construction and minimal on-site labor, which wall panel method offers the most strategic advantage?

a)

Tilt-up construction

b)

Precast concrete construction

c)

Platform framing

d)

Reinforced masonry

6.

For a commercial building with slow roof drainage, what is the reasoning behind specifying continuous membrane roofing over other options?

a)

It is more decorative

b)

It provides seamless waterproofing and prevents leaks

c)

It is less expensive than clay tiles

d)

It is easier to install than timber planks

7.

When selecting a wall system for a high-rise building in a windy region, which system should be chosen to ensure structural integrity and why?

a)

Unreinforced masonry

b)

Veneer masonry

c)

Reinforced masonry,

d)

Load-bearing stud wall

8.

In a project where concrete wall panels are cast and lifted into place on site, what strategic planning consideration must be made regarding site logistics?

a)

Ensure adequate space for cranes and panel storage

b)

Use only manual labor for lifting panels

c)

Cast panels vertically for easier installation

d)

Avoid scheduling during rainy weather

9.

If a building consistently experiences leaks at roof edges after rain, what evidence-based reasoning supports the need for proper flashing installation?

a)

Flashing prevents water infiltration at vulnerable joints

b)

Ceiling finish absorbs excess water

c)

Roof insulation keeps the roof dry

d)

Timber planks direct water away from edges

10.

A sloping roof uses rafters, purlins, and decking to support the roofing material. Which description best fits this roof structure?

a)

Nonstructural roof assembly

b)

Typical sloping roof structure

c)

Flat roof system

d)

Curtain wall roof system

11.

Precast concrete roof slabs are installed and topped with reinforced concrete to act as one structural unit. What is the main purpose of the topping?

a)

Improve surface finish only

b)

Add thermal insulation

c)

Provide structural continuity

d)

Reduce roof slope

12.

A flat roof framed with steel beams and decking is designed similarly to a floor system. This roof structure is most comparable to:

a)

Timber truss roofing

b)

Masonry bearing construction

c)

Steel floor framing

d)

Cementitious plank roofing

13.

A roof design includes gutters, downspouts, and scuppers to safely direct rainwater away from the structure. What system is being addressed?

a)

Roof insulation system

b)

Roof drainage system

c)

Roof framing system

d)

Roof finishing system

14.

Bearing connections for precast roof slabs are detailed to allow slight horizontal movement. What problem does this prevent?

a)

Roof uplift during typhoons

b)

Cracking due to creep, shrinkage, and temperature changes

c)

Excessive roof deflection

d)

Poor roof drainage

15.

When designing a roof system to resist uplift forces during a typhoon, which connection detail is most critical?

a)

Roof-to-wall anchorage

b)

Gutter installation

c)

Roof insulation

d)

Downspout sizing

16.

For a roof drainage system, what is the strategic reason for including overflow scuppers in the design?

a)

To improve insulation

b)

To prevent water accumulation and roof collapse

c)

To enhance visual appearance

d)

To reduce construction time

17.

A designer chooses a roofing system composed of multiple layers of bitumen and felt for a low-slope roof requiring durability. Which system is this?

a)

Single-ply roofing

b)

Built-up roofing (BUR)

c)

Vegetated roofing

d)

Sheet metal roofing