wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

POM Quiz #2 (QC Rep)

Total questions: 30

Worksheet time: 15mins

Name
Class
Date
1.

What is the POM’s first responsibility when starting the role?

a)

Perform QC Rep duties to a high standard

b)

Recruit subcontractors immediately

c)

Support sales appointments

d)

Manage painter schedules

2.

Why must the POM master the QC Rep role before moving up?

a)

It’s required for payroll approval

b)

It builds credibility with sales

c)

It’s the foundation before leadership tasks

d)

Corporate requires 90 days in QC

3.

Who is the ONLY person allowed to handle homeowner questions or changes?

a)

Painting Operations Manager

b)

QC Rep

c)

Project Manager

d)

Subcontractor crew lead

4.

Why should the POM avoid homeowner and painter coordination?

a)

It slows production

b)

It causes liability issues

c)

It robs the PM of clarity and creates conflict

d)

It reduces review rates

5.

What should the POM do if a homeowner pulls them into an issue?

a)

Solve it on the spot

b)

Call the painter directly

c)

Pass it to the Project Manager

d)

Ignore the homeowner

6.

What is the POM’s correct job flow at each house?

a)

Inspect, fix issues, talk to homeowner

b)

Inspect, submit form, leave

c)

Inspect, coach painters, leave

d)

Inspect, call PM on-site

7.

How long should a QC visit typically take?

a)

10–15 minutes

b)

20–30 minutes

c)

45–60 minutes

d)

As long as needed

8.

What should NEVER happen during a QC visit?

a)

Friendly homeowner interaction

b)

Complete documentation

c)

Problem-solving or long conversations

d)

Photo documentation

9.

Where should all QC findings be documented?

a)

Text messages to PM

b)

Notes app

c)

GoCanvas forms

d)

Email summaries

10.

When must QC forms be submitted?

a)

End of day

b)

Within 24 hours

c)

Before leaving the job

d)

After PM review

11.

What are the three types of QC inspections?

a)

Setup, mid-job, close-out

b)

Initial, daily check-in, final walkthrough

c)

Pre-job, mid-job, post-job

d)

Inspection, audit, warranty

12.

How soon must the daily check-in form be completed after arrival?

a)

Within 15 minutes

b)

Within 30 minutes

c)

Before lunch

d)

By end of day

13.

What should the QC Rep do during daily inspections?

a)

Spot-check visible areas

b)

Scan every surface top to bottom

c)

Only inspect active work areas

d)

Inspect homeowner concerns only

14.

What happens if a QC Rep skips a question on a form?

a)

Nothing, if photos are good

b)

PM fills it in later

c)

It creates a blind spot for the PM

d)

It delays payment only

15.

Why are GoCanvas forms critical to the PM?

a)

For payroll tracking

b)

They are the PM’s eyes on the project

c)

They replace customer calls

d)

They track painter hours

16.

What must happen at every final walkthrough?

a)

Painter meeting

b)

Homeowner payment collection

c)

5-star review and video request

d)

Warranty scheduling

17.

What should the QC Rep do after asking for a Google review?

a)

Leave and follow up later

b)

Wait while the homeowner leaves it

c)

Email the link

d)

Ask the PM to handle it

18.

Why should the QC Rep never leave without the review?

a)

Corporate policy

b)

Homeowners won’t do it later

c)

Payment depends on it

d)

It speeds up closeout

19.

If a homeowner lacks a Google account, what should the QC Rep do?

a)

Skip the review

b)

Call the PM

c)

Help create one quickly

d)

Send a follow-up email

20.

What should a video testimonial include?

a)

Painter names

b)

Why they chose Panamera and what stood out

c)

Pricing details

d)

Lengthy project summary

21.

What should the QC Rep say when a homeowner raises an issue?

a)

“I’ll handle that for you.”

b)

“I’ll tell the painters.”

c)

“Let me pass that to your PM.”

d)

“Email the office.”

22.

Why must the PM remain the center of all communication?

a)

They control payroll

b)

They have schedules and full context

c)

They are on-site daily

d)

They manage sales

23.

How should QC Reps interact with painters?

a)

Give instructions and corrections

b)

Coach them on-site

c)

Report issues through GoCanvas

d)

Ignore visible issues

24.

What is the QC Rep’s role in quality control?

a)

Fix painter mistakes

b)

Be the first line of defense for quality

c)

Approve painter work

d)

Train homeowners

25.

What should NEVER happen on a job site?

a)

Painter questions

b)

Minor touchups

c)

Homeowner finding issues before QC

d)

PM follow-ups

26.

Which item must be inspected on every job?

a)

Only active paint areas

b)

Only trim and siding

c)

Caulking, scraping, priming, masking, paint, cleanup

d)

Just homeowner concerns

27.

Which tool is required for all QC work?

a)

Personal phone only

b)

Laptop

c)

iPad with GoCanvas

d)

Paper checklist

28.

What driving standard must QC Reps follow?

a)

Fastest route

b)

Personal preference

c)

Assigned GPS route only

d)

Painter directions

29.

When is a QC Rep clocked out for the day?

a)

Leaving the last job

b)

Calling the PM

c)

Submitting the final form

d)

Returning to the office

30.

What is the QC Rep role really about?

a)

Walking houses

b)

Protecting the brand and customer experience

c)

Supporting painters

d)

Reducing PM workload