APLC UNIT 5

Total questions: 27

Worksheet time: 14mins

Name
Class
Date
1.

Common reasons why PLC control systems fail:

a)

module failure

b)

power outages

c)

bad network connections

d)

ALL

2.

Possible root cause for I/O module and input/output point problems:

a)

Configuration error

b)

Tripped circuit breaker

c)

Loose terminal block

d)

All

3.

Most of the cases the PLC fails due to following factors:

a)

the input/output (I/O)

b)

Problems with a field device

c)

Problems with the power supply network

d)

All

4.

Protecting both the PLC and maintenance personnel _____ is very Important.

a)

Proper Grounding

b)

Frequent Rebooting

c)

Software Updates

d)

Loose Wiring

5.

EMI stands for _____

a)

Electromagnetic Interference

b)

Electronic Magnetic Induction

c)

Electrical Machine Interface

d)

Energy Management Integration

6.

RFI stands for _____

a)

Radio frequency interference

b)

Remote Frequency Indicator

c)

Random File Input

d)

Rapid Fire Integration

7.

Source of Electromagnetic Interference:

a)

High frequency devices

b)

Power lines

c)

Electric motors

d)

All

8.

Lightning causes _____ Electrical Noise interference.

a)

Electromagnetic interference

b)

Thermal interference

c)

Mechanical interference

d)

Optical interference

9.

The memory of a PLC can become corrupted due to _____

a)

ALL

b)

Power surges

c)

Physical damage

d)

Software bugs

e)

Incorrect wiring

10.

To avoid the possibility of power failure, the majority of today's industrial facilities have _____

a)

Backup power sources

b)

Open windows

c)

Extra parking lots

d)

Swimming pools

11.

Identify the redundant power source for Back up.

a)

UPS

b)

Current source

c)

DC Power Source

d)

AC Power Source

12.

Power failures can cause damage such as _____

a)

System damage & Data loss

b)

Increased internet speed

c)

Improved battery life

d)

Enhanced graphics performance

e)

Faster software updates

13.

On some PLCs, _____ are installed for prolonged power when a blackout hits.

a)

Batteries

b)

Fuses

c)

Relays

d)

Transformers

14.

To safeguard system's smooth communication framework loss, engineers must _____ the connections between devices.

a)

regularly inspect

b)

randomly disconnect

c)

rarely monitor

d)

occasionally ignore

15.

PLC fails factors:

a)

Electromagnetic interference

b)

Electromechanical interference

c)

Electromechanical induction

d)

ALL

16.

EMI _____

a)

Electromagnetic interference

b)

Electronic magnetic induction

c)

Electro mechanical integration

d)

Energy magnetic impulse

17.

The memory of a PLC can become corrupted by _____

a)

ALL

b)

Power surges

c)

Physical damage

d)

Software bugs

e)

Incorrect wiring

18.

What protecting both the PLC and maintenance personnel.

a)

grounding

b)

insulation

c)

fusing

d)

labeling

19.

RFI _____

a)

radio frequency interference

b)

random frequency input

c)

remote file integration

d)

rapid frequency increase

20.

Most PLC control systems need to communicate with periphery devices such as _____

a)

Human Machine Interfaces (HMIs)

b)

Light bulbs

c)

Speakers

d)

Printers

21.

A loss of communication between devices will often result in immediate _____

a)

Plant downtime

b)

increase in production

c)

system upgrade

d)

employee promotion

22.

The peripheral Devices and HMI's are connected with one another via _____ cables.

a)

Ethernet cables

b)

USB cables

c)

HDMI cables

d)

VGA cables

23.

A PLC system surrounded by _____ equipment could be at risk of failure if not properly safeguarded.

a)

Heat emitting

b)

Water cooling

c)

Magnetic

d)

Insulated

24.

To keep the area around the PLC at a relatively low temperature, _____

a)

The cooling setting

b)

The power supply

c)

The input module

d)

The output relay

25.

At temperatures well below the maximum threshold, _____

a)

Manufacturer

b)

Processor

c)

User

d)

Device

26.

A PLC can _____ when the internal status of code is incompatible with something that occurs on the outside.

a)

malfunction or fail

b)

increase efficiency

c)

communicate wirelessly

d)

store more data

27.

In order to reduce the possibility of PLC problems, facility engineers must follow _____ to ensure all parts are safeguarded at all ends.

a)

procedural steps

b)

random checks

c)

verbal instructions

d)

unplanned actions