Day 85-Dec 22-worksheet-Btech-Project management & networking

Total questions: 15

Worksheet time: 10mins

Name
Class
Date
1.

The most important phase of a project, where objectives and resources are clearly defined, is:

a)

Scheduling

b)

Controlling

c)

Execution

d)

Planning

2.

The oldest project scheduling technique developed by Henry Gantt is:

a)

CPM

b)

PERT

c)

Bar chart

d)

Network diagram

3.

In a bar chart, the length of the bar represents:

a)

Cost of activity

b)

Sequence of activities

c)

Duration of activity

d)

Type of resource

4.

In Activity-on-Arrow (AOA) network, activities are represented by:

a)

Nodes

b)

Circles

c)

Arrows

d)

Squares

5.

A dummy activity in a network diagram is represented by:

a)

Thick arrow

b)

Solid arrow

c)

Double line

d)

Dashed arrow

6.

An event consumes time and resources in a project network.

a)

True

b)

False

7.

Parallel activities can be performed simultaneously and are independent of each other.

a)

True

b)

False

8.

Assertion–Reason Assertion (A): Dummy activities do not consume time or resources. Reason (R): Dummy activities are used only to show dependency between activities. Choose the correct option.

a)

Both A and R are true and R explains A

b)

Both A and R are true but R does not explain A

c)

A is true but R is false

d)

A is false but R is true

9.

Controlling involves comparison between what ———progress and actual progress?

(a)  

10.

A milestone chart is a modification of ——-chart

(a)  

11.

Logical links between activities are shown clearly in what kind of bar charts?

a)

Linked

b)

Simple

c)

Floating

d)

Three-dimensional

12.

Work Breakdown Structure follows topdown approach

a)

True

b)

False

13.

An event represents an ———time

(a)  

14.

An event that marks the starting of an activity is called ——-event

(a)  

15.

An artificial activity that establishes dependency is called ——-

(a)