1.

Which of the following is the most accurate method of batching concrete ingredients?

a)

Volume batching

b)

Weight batching

c)

Random batching

d)

Hand batching

2.

The minimum mixing time required for concrete in a drum-type mixer is generally:

a)

30 seconds

b)

60 seconds

c)

90 seconds

d)

120 seconds

3.

Which of the following methods is NOT a common way of transporting concrete?

a)

Pumping

b)

Belt conveyor

c)

Bucket and crane

d)

Chute and trolley

4.

The main purpose of compaction in concreting is to:

a)

Remove air voids

b)

Reduce permeability

c)

Increase strength

d)

All of the above

5.

Which curing method is most effective in hot weather conditions?

a)

Sprinkling with water

b)

Steam curing

c)

Ponding

d)

Curing compounds

6.

The minimum curing period recommended for concrete as per IS 456:2000 is:

a)

3 days

b)

7 days

c)

14 days

d)

28 days

7.

Which of the following is NOT a material used for formwork?

a)

Timber

b)

Steel

c)

Glass

d)

Aluminum

8.

The formwork removal time for beams as per IS 456:2000 is typically:

a)

3 days

b)

7 days

c)

14 days

d)

21 days

9.

Which type of formwork is best suited for repetitive use in large projects?

a)

Timber formwork

b)

Plywood formwork

c)

Aluminum formwork

d)

Cardboard formwork

10.

Which of the following is NOT a requirement of good formwork?

a)

It should be strong enough to withstand loads

b)

It should be lightweight

c)

It should be costlier than concrete

d)

It should be reusable

11.

What is the primary advantage of system formwork over conventional formwork?

a)

Higher cost

b)

Faster construction

c)

Lower durability

d)

Only for small projects

12.

Which of the following statements is true about stripping time for slab formwork as per IS 456:2000?

a)

Minimum 3 days

b)

Minimum 7 days

c)

Minimum 14 days

d)

Minimum 21 days

13.

Which of the following is NOT an error in concrete construction?

a)

Excessive water in mix

b)

Improper curing

c)

Correct proportioning of materials

d)

Inadequate compaction

14.

Which test is commonly performed to check the workability of fresh concrete?

a)

Compressive strength test

b)

Slump test

c)

Water absorption test

d)

Flexural strength test

15.

What is the primary reason for performing quality control checks before concreting?

a)

To increase cost

b)

To ensure consistency and durability

c)

To reduce labor effort

d)

To change concrete mix ratio randomly

16.

Which of the following is included in a checklist before concreting?

a)

Checking the formwork alignment

b)

Ensuring proper reinforcement placement

c)

Verifying mix proportion

d)

All of the above

17.

Which IS code provides guidelines for quality control of concrete construction?

a)

IS 383

b)

IS 456

c)

IS 10262

d)

IS 2386

18.

Honeycombing in concrete is caused by:

a)

Excess water in the mix

b)

Poor compaction

c)

High cement content

d)

Proper vibration

19.

Which of the following is a method to improve concrete durability?

a)

Reducing cement content

b)

Increasing water-cement ratio

c)

Proper curing

d)

Using fine aggregates only

20.

The cube test for concrete strength is conducted after how many days for final results?

a)

3 days

b)

7 days

c)

28 days

d)

56 days