Unit 03 MCQ combined with 04 PPT1-3

Total questions: 50

Worksheet time: 25mins

Name
Class
Date
1.

What percentage of communication is unspoken?

a)

50%

b)

Under 90%

c)

Over 90%

d)

10%

2.

What is a typical problem caused by poor planning?

a)

Delays to completion

b)

Incorrect cable sizes

c)

Late starts in the morning

d)

Poor qualifications

3.

Order these positions or roles within a company from most responsible to least: A Electrician, B Manager, C Director, D Apprentice

a)

A B C D

b)

C B A D

c)

A D B C

d)

D A B C

4.

Which of the following is not a trade you would find on-site during the construction phase?

a)

Commissioning engineer

b)

HVAC engineer

c)

Joiner

d)

Structural steel installer

5.

How can you confirm the validity of a CSCS card?

a)

Ask the holder relevant questions

b)

Confirm with their manager

c)

Ask the HSE

d)

Use an online card checker

6.

Which of the following is normally found to be a cause for delay of a contract?

a)

Force majeure

b)

Temporary road works

c)

Training of the customer's staff

d)

Clerk of works finding problems

7.

What is an advantage of making a phone call to discuss contract delivery issues as a means of communication?

a)

There is a record of what is discussed

b)

Feedback is immediate

c)

Both parties will agree on outcomes

d)

There will be a delay in getting an answer

8.

How are alterations to a contract specification controlled and agreed?

a)

With a schedule of works

b)

By the site manager

c)

With a variation order

d)

By the architect

9.

Which of the following is a way you can reduce conflict on-site?

a)

Hold regular site meetings to discuss problems

b)

Kick-off meeting with the main contractor

c)

Toolbox talks

d)

Arrange CPD supplier conferences

10.

If you have been asked by the customer on-site to explain the operation of installed equipment, select two possible actions from the answers below:

a)

If you are confident and understand it, you should explain

b)

If you are not confident, politely decline and ask them to speak to the CDM

c)

If you are not confident, you should politely decline and refer them to your supervisor

d)

Say you can't as you have not been trained officially

e)

If you are not confident, you should try to explain

11.

Which of the following is an example of a numbered and measured item?

a)

1.5mm² single cable and trunking

b)

Light switches and glass breaks

c)

Luminaires and tray work

d)

Mini trunking and basket tray

12.

Which of the following is a method used to ensure a quick efficient installation?

a)

Offer training in-house on an on-job basis

b)

Project management of parts required

c)

Recruit more staff

d)

Allocate work to people with the correct skill set

13.

Which of the following is used to ensure safe working practice on site?

a)

Welfare facilities

b)

Power distribution system

c)

Timely deliveries

d)

Toolbox talks

14.

What is the following a definition of? A means of authorising a contractor to immediately begin delivering supplies or performing services before the terms and conditions of the contract can be agreed upon.

a)

A memorandum of understanding

b)

A letter contract

c)

A non-disclosure agreement

d)

A temporary contract

15.

What may cause your company to have to pay a penalty clause?

a)

Bad weather

b)

Poor workmanship

c)

Bad behaviour

d)

Poor site conditions

16.

Refer to the snapshot image of a schedule. What do the black lines indicate?

a)

Cancelled work

b)

Rework

c)

Inspection work

d)

Progress

17.

What is the name of the type of chart shown in the image for the previous question?

a)

Gantt

b)

Bar

c)

CPA

d)

Line

18.

Refer to the image on the right. What do the red arrows represent?

a)

The delivery schedule for parts

b)

The milestones for the project

c)

The building inspector schedule

d)

The shortest time it will take to complete the project

19.

What must be signed on receipt of goods on-site?

a)

The purchase order

b)

The invoice

c)

The delivery note

d)

The check sheet

20.

What does the image to the right represent on a schedule?

a)

Activity A depends on Activity B

b)

Activity B must be finished before Activity A

c)

Activity A has no impact on Activity B

d)

Activity A must be finished before Activity B starts

21.

The Health and Safety at Work etc. Act 1974 is:

a)

A Code of Practice

b)

An Enabling Act (primary legislation)

c)

A Statutory Instrument

d)

A Guidance Note

22.

Which document is a Statutory Instrument (secondary legislation)?

a)

IET On-Site Guide

b)

BS 7671

c)

The Electricity at Work Regulations 1989

d)

IET Guidance Note 3

23.

The phrase "so far as is reasonably practicable" in HASAWA means:

a)

Safety measures must be taken at any cost

b)

Safety measures don't need to be taken if expensive

c)

Measures must be taken unless cost is grossly disproportionate to risk

d)

Only basic safety measures are required

24.

The Management of Health and Safety at Work Regulations 1999 requires employers to:

a)

Provide free PPE to all employees

b)

Carry out a suitable risk assessment

c)

Employ a full-time safety officer

d)

Display the health and safety law poster

25.

Which regulation has "absolute" requirements (no "reasonably practicable" relaxation)?

a)

Health and Safety at Work etc. Act 1974

b)

Provision and Use of Work Equipment Regulations 1998

c)

Electricity at Work Regulations 1989 (e.g., sound connections)

d)

Building Regulations 2010

26.

Part S of the Building Regulations applies to:

a)

Electrical safety in dwellings

b)

Infrastructure for charging electric vehicles

c)

Fire safety in commercial buildings

d)

Structural stability

27.

BS 7671 (IET Wiring Regulations) is primarily:

a)

UK primary law

b)

The national standard for electrical installations

c)

Guidance for electricians only

d)

A replacement for the EAWR

28.

The IET On-Site Guide is best described as:

a)

A legally-binding version of BS 7671

b)

A guide to BS 7671 that doesn't guarantee compliance

c)

A document for architects only

d)

The primary source for electrical design

29.

A document providing practical guidance on complying with legal obligations is a:

a)

Statutory Instrument

b)

British Standard

c)

Code of Practice

d)

Manufacturer's instruction

30.

Which is a NON-Statutory document?

a)

The Electricity at Work Regulations 1989

b)

IET Guidance Note 3: Inspection & Testing

c)

The Management of Health and Safety at Work Regulations 1999

d)

Part P of the Building Regulations

31.

A "Safe System of Work" is:

a)

A list of required tools

b)

A hazard list

c)

A set of procedures for carrying out work

d)

A permit for confined spaces

32.

The systematic process of identifying hazards and evaluating risks is:

a)

A Method Statement

b)

A Risk Assessment

c)

A Permit to Work

d)

A Site Survey

33.

A Method Statement primarily:

a)

Identifies first aid responsibility

b)

Records weather conditions

c)

Details step-by-step task procedures

d)

Calculates material costs

34.

A 'Permit to Work' is typically required for:

a)

Installing a socket in an office

b)

Working on live equipment or confined spaces

c)

Unloading materials

d)

Completing risk assessments

35.

The FIRST step in the HSE's 5-step risk assessment is:

a)

Record findings

b)

Identify hazards

c)

Evaluate risks

d)

Identify who might be harmed

36.

In the Hierarchy of Control, the MOST effective measure is:

a)

Personal Protective Equipment (PPE)

b)

Warning signs

c)

Machine guards

d)

Eliminating the hazard

37.

If you employ five or more people, you must:

a)

Display risk assessments publicly

b)

Record significant findings of risk assessments

c)

Send them to the HSE

d)

Have them signed by a doctor

38.

Safe access and egress is specifically required by:

a)

Building Regulations only

b)

Workplace Regulations 1992

c)

Electricity at Work Regulations only

d)

No specific legislation

39.

A document breaking down high-risk tasks into sequential safety steps is a:

a)

Risk Assessment

b)

Method Statement

c)

Permit to Work

d)

Schedule of Condition

40.

For investigating a fault on a live 400V distribution board, you need:

a)

Risk Assessment

b)

Method Statement

c)

Permit to Work

d)

Site Induction record

41.

A 'schedule of condition' before work is to:

a)

Satisfy building control

b)

Record property state to protect against damage claims

c)

Plan cable routes

d)

Calculate waste

42.

The BEST evidence for a schedule of condition is:

a)

Verbal agreement

b)

Handwritten list

c)

Dated photographs/video

d)

Note from previous contractor

43.

Who should agree to the schedule of condition before work?

a)

The electrician only

b)

Site manager only

c)

The client or representative

d)

Building control

44.

To protect a finished oak floor in an access hallway:

a)

Work carefully

b)

Clean shoes thoroughly

c)

Cover with protective boards/plastic

d)

Ask client not to use it

45.

If furniture cannot be removed from work area:

a)

Work around it carefully

b)

Move it yourself

c)

Cover with dust sheets

d)

Ask client to hold it

46.

To make good a plaster wall while maintaining fire safety:

a)

Use any filler

b)

Use polystyrene

c)

Use plaster (non-combustible)

d)

Use timber battens

47.

If decorative wallpaper is damaged:

a)

Ignore it (cosmetic only)

b)

Glue it back with any adhesive

c)

Inform client at job end

d)

Repair with matching wallpaper using proper techniques

48.

Pre-existing damage checks should cover areas affected by:

a)

Physical installation only

b)

All work activities (delivery, setup, cleaning, waste removal)

c)

Final testing only

d)

Client's movements only

49.

Protecting building fabric during work is important to:

a)

Make job take longer

b)

Limit damage and maintain safety

c)

Satisfy Building Regulations for new builds only

d)

Avoid using dust sheets

50.

Finding a large pre-existing crack before chasing a wall, FIRST:

a)

Chase anyway (not your problem)

b)

Document with photo and inform client immediately

c)

Fill crack before starting

d)

Avoid that section without telling anyone