
Floor Framing (Formative)
Flashcard
•
Specialty
•
9th - 12th Grade
•
Practice Problem
•
Easy
Wayground Content
Used 1+ times
FREE Resource
Student preview

39 questions
Show all answers
1.
FLASHCARD QUESTION
Front
In Balloon framing, studs extend from the sill to the rafter plate.
Back
True
2.
FLASHCARD QUESTION
Front
When cutting openings in joists, cuts should be made along the bottom edge.
Back
False
3.
FLASHCARD QUESTION
Front
Floor joist carry the weight of the floor between the sills and girders.
Back
True
4.
FLASHCARD QUESTION
Front
The type of steel beam commonly used in residential construction is__________ beams.
Back
W
5.
FLASHCARD QUESTION
Front
Units such as truss joists, wood I beams, open web joists, and steel joists, are known collectively as _________ lumber.
Back
Engineered
6.
FLASHCARD QUESTION
Front
The subfloor _________.
Back
adds rigidity to the structure, provides a base for finish flooring materials, provides a surface for the carpenter to lay out and construct framing.
7.
FLASHCARD QUESTION
Front
Name of "A" (Options: Joist, Subfloor, Stud, Sole Plate)
Back
Stud
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?