1.
FLASHCARD QUESTION
Front
If the primary coil voltage ratings of the transformers match the _____________________, then connect _____________.
Back
phase-to-phase voltage of the system; Wye.
2.
FLASHCARD QUESTION
Front
What does a single primary coil voltage rating indicate about a transformer's usage?
Back
it should be used for phase-to-ground connections only.
3.
FLASHCARD QUESTION
Front
Ava is working on a project that involves setting up electrical systems. She needs to determine which of these service voltages on the work order require “Alley-Cat/Bad-Dog”? 120/208, 240, 120/240, 240/480
Back
120/208
4.
FLASHCARD QUESTION
Front
Aiden and Sophia are working on a project involving transformers. They need to decide on the configuration of the secondary windings. What is the reason for connecting the secondary windings in parallel?
Back
To use the full kVA rating of the transformers.
5.
FLASHCARD QUESTION
Front
Which of these combinations best represents the connection for paralleling the windings? Options: Connect “A” and “B” together to a bushing, then “C” and “D” together to another bushing.; Connect “A” and “C” together to a bushing, and then “B” and “D” together to another bushing.; Connect “A” and “D” together to a bushing, then “B” and “C” together to another bushing.; Connect “A” and “C” together to a bushing, and leave “B” and “D” in place.
Back
Connect “A” and “B” together to a bushing, then “C” and “D” together to another bushing.
6.
FLASHCARD QUESTION
Front
Harper is working on a project to supply three-phase power from an underground system. Which of these statements about using underground transformers for three-phase service is true?
- When supplying three-phase power from underground systems, the transformers used are always single units.
- The “Power” pad-mount used in an open bank configuration must have the grounding strap removed from the X2.
- Only three-phase pad-mounts may be used.
- The banking connections for three-phase units must be done externally.
Back
The “Power” pad-mount used in an open bank configuration must have the grounding strap removed from the X2.
7.
FLASHCARD QUESTION
Front
Which of these statements regarding Non-Standard Connections is true? Options: You can get 120/208 from single-phase Delta. It’s possible to get two 120/208 3-phase services from one Delta-Delta bank. To complete a three-phase connection, you must ground at the X2 only. A Delta or Wye can be grounded one time at any coil terminal and still operate properly.
Back
A Delta or Wye can be grounded one time at any coil terminal and still operate properly.
Create a free account and access millions of resources
Similar Resources on Wayground
15 questions
Transformer Models and Tokenization Concepts

Flashcard
•
University
14 questions
2019 Logos

Flashcard
•
Professional Development
5 questions
Placement - online test I (transformers)

Flashcard
•
Professional Development
15 questions
Weathering and Erosion Review

Flashcard
•
KG
15 questions
LAP Year2 Week2

Flashcard
•
University
12 questions
Logos Trivia

Flashcard
•
Professional Development
16 questions
Jurassic World

Flashcard
•
KG - Professional Dev...
11 questions
DSP Trivia - Chancellor

Flashcard
•
University
Popular Resources on Wayground
50 questions
Trivia 7/25

Quiz
•
12th Grade
11 questions
Standard Response Protocol

Quiz
•
6th - 8th Grade
11 questions
Negative Exponents

Quiz
•
7th - 8th Grade
12 questions
Exponent Expressions

Quiz
•
6th Grade
4 questions
Exit Ticket 7/29

Quiz
•
8th Grade
20 questions
Subject-Verb Agreement

Quiz
•
9th Grade
20 questions
One Step Equations All Operations

Quiz
•
6th - 7th Grade
18 questions
"A Quilt of a Country"

Quiz
•
9th Grade