1.

FLASHCARD QUESTION

Front

What should you do if your lot is (-) 15.00 m from the street line level?

Back

Retaining wall

2.

FLASHCARD QUESTION

Front

A hydrologic soil test should be made…

Back

Before excavation

3.

FLASHCARD QUESTION

Front

From which part of the site will you get a sample for soil test?

Back

Where the column shall be located

4.

FLASHCARD QUESTION

Front

Which method is intentionally installed for permanence in supporting a slope in an excavated area? Options: Steel sheet piling, Precast concrete piling, Soldier beams and lagging, Slurry wall

Back

Slurry wall

5.

FLASHCARD QUESTION

Front

If excavation is beyond 3.00 meters with an adjacent structure, what should you use?

Back

Bored pile

6.

FLASHCARD QUESTION

Front

It is the least effective joining method, but mostly commonly used due to its ease.

Back

Butt joint

7.

FLASHCARD QUESTION

Front

How many board foot is 250 pcs – 2” x 3” x 10’ ?

Back

1,250 bd. Ft.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?