Search Header Logo
ACR-204 Homework week 1

ACR-204 Homework week 1

Assessment

Flashcard

Professional Development

Professional Development

Practice Problem

Hard

Created by

Wayground Content

FREE Resource

Student preview

quiz-placeholder

14 questions

Show all answers

1.

FLASHCARD QUESTION

Front

The component used to switch the heat pump unit between the heating and cooling modes of operation is the ____.

Back

four-way valve

2.

FLASHCARD QUESTION

Front

An air-to-air heat pump ____ heat from the outside air and deposits it in the conditioned space.

Back

removes

3.

FLASHCARD QUESTION

Front

The main valve in a pilot-operated four-way reversing valve is moved by pressure created by the ____.

Back

low and high side pressure difference

4.

FLASHCARD QUESTION

Front

The larger line in an air-to-air split-system heat pump is known as the ____ line.

Back

gas

5.

FLASHCARD QUESTION

Front

The smaller line in an air-to-air split-system heat pump is known as the ____ line.

Back

liquid

6.

FLASHCARD QUESTION

Front

When brazing a four-way reversing valve, a wet rag could be wrapped around the body of the valve to minimize the chance of internal damage to the valve.

Back

True

7.

FLASHCARD QUESTION

Front

During operation, the compressor motor will rotate in the opposite direction to change the direction of refrigerant flow.

Back

false

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?