1
US 30532
Videos & images courtesy of google.com & youtube.com
Please complete all of the self checks to gain your final assessment grade (80%)
2
3
4
5
Look at the range of hazards you need to be aware of
6
7
8
See the next slide
9
Multiple Select
What were the issues?
Spoil placed to close to edge of trench.
Edges of excavation should be battered or benched down
Excavator to close to excavation could collapse trench.
Digger operator can't see his workers
Workers not wearing RPE
10
Head down bum up ,how often is this the case just get in and get the job done . Not taking any time to consider any hazards around you or others
11
Try researching these documents
12
13
There are examples of these in the ACOP for Excavations & Shafts, also do a web search and view your study guide on the types of dewatering methods
14
Use your ACOP for Excavations & Shafts for further info
15
16
17
Good signage and barriers here!
18
Legally you have a responsibility to make sure you do not bring harm to yourself or others,If someone injures themselves because you haven’t protected your excavation you and your employer are liable to be charged In court
19
Edge protection in place to keep the public safe
20
21
Taken from G13, check the rest of this code out! Proximity of open trenches to foundations is very important, especially if it is close to a boundary.
22
Look at this scenario, any issues?
23
24
25
26
Team work often relies on your mates all chipping in, check out the next slide to see what happens if you have too many mates in a trench!
27
28
This poor worker did not survive
29
Watch the next slide
This shows how fast a job can go horribly wrong with the incorrect shoring and excavtion/ demolition process
30
31
Dewatering
32
33
Final question set #1
Answer the following
34
Multiple Choice
At what depth must you notify worksafe about excavations?.
2m
1.5
3m
2.5
35
Multiple Select
What is the term used when making a excavation safe?
trimming
angle cut
benching
bulk cut
36
Multiple Select
What 3 things should you check before you begin excavation.
Check you have the right tools
You have permission/consent to excavate
Service plans
A 20 ton digger.
Supervisors instruction
37
Multiple Choice
What is the safe distance to leave spoil near an excavation edge
1m
600mm
1.5m
As close as practicable
38
Multiple Choice
Which is the correct side of excavation to place spoil?
The bottom picture
The top picture
Non, it should be further away
39
Multiple Choice
What is this diagram showing?
A trench next to a building
A trench next to a retaining wall
A trench showing safe distance away from wall.
A trench showing safe distance from a footing
40
41
42
43
Look at this a couple of times to get the concept. "A" calculation is a deduction to make the pit even
44
Final question check #2
Answer the following
45
Multiple Select
What are the first 2 things do you need to consider when dewatering trenches.
How long is it going to take
Do I need permission to dewater trench from council/Supervisor
Are dewatering controls are in place
How much water volume.is being pumped
Can dirty water can be into a kerb and channel
46
Multiple Select
What is the hierarchy of hazard control.
Protect
Eliminate
Safeguard
Isolate
Minimize
47
Multiple Choice
Calculate the total volume only
210m cube
504
420m cube
Approx 480 cube
48
Well done!
You have now completed this lesson and your final assessment
US 30532
Videos & images courtesy of google.com & youtube.com
Please complete all of the self checks to gain your final assessment grade (80%)
Show answer
Auto Play
Slide 1 / 48
SLIDE
Similar Resources on Wayground
45 questions
Roberts_IDL_7020_NSQ Standard D
Presentation
•
Professional Development
41 questions
Shopping, Restaurant and Direction
Presentation
•
University
46 questions
Dealing with Pitfalls/Problems
Presentation
•
Professional Development
40 questions
Audit Priciples, Typical Audit
Presentation
•
Professional Development
44 questions
Maya, Aztec, Inca
Presentation
•
6th - 8th Grade
44 questions
CMP Workshop
Presentation
•
Professional Development
42 questions
Post Certification Training
Presentation
•
Professional Development
41 questions
Account Management
Presentation
•
Professional Development
Popular Resources on Wayground
20 questions
STAAR Review Quiz #3
Quiz
•
8th Grade
20 questions
Equivalent Fractions
Quiz
•
3rd Grade
6 questions
Marshmallow Farm Quiz
Quiz
•
2nd - 5th Grade
20 questions
Main Idea and Details
Quiz
•
5th Grade
20 questions
Context Clues
Quiz
•
6th Grade
20 questions
Inferences
Quiz
•
4th Grade
19 questions
Classifying Quadrilaterals
Quiz
•
3rd Grade
12 questions
What makes Nebraska's government unique?
Quiz
•
4th - 5th Grade