Exam 3 - Chapters:13-15

Exam 3 - Chapters:13-15

Assessment

Presentation

Architecture

University

Hard

Created by

Jeremiah Arnett

Used 1+ times

FREE Resource

4 Slides • 60 Questions

1

Exam 3 Chapters: 13-15

By Jeremiah Arnett

2

Chapter 13:

Some text here about the topic of discussion

3

Multiple Choice

Type ___ copper pipe is used for drain, waste, and vent applications.

1

G

2

M

3

DWV

4

K

4

Multiple Choice

The most common iron from which cast iron soil pipe and fittings are produced is ___ iron.

1

white

2

ductile

3

gray

4

malleable

5

Multiple Choice

___ pipe is available in cementing-only grades or in cementing or threading grades.

1

PEX

2

Cast iron

3

Copper

4

PVC

6

Multiple Choice

___ pipes branch off from the liquid-carrying waste pipes and commonly terminate above the roofline.

1

Process

2

Vent

3

Supply

4

Commercial

7

Multiple Choice

Materials for ___ piping include copper, PVC, and PEX.

1

waste

2

process

3

vent

4

supply

8

Multiple Choice

As a general rule, the installation costs for a basic plumbing fixture may be taken as ___% of the total fixture cost.

1

25

2

30

3

45

4

50

9

Multiple Choice

For high-quality fixtures and materials, a rate of approximately ___% of the total fixture cost is used for determining labor costs.

1

25

2

30

3

40

4

50

10

Multiple Choice

Elevations for waste piping between the elevation reference points are indicated as a percentage of ___.

1

total cost

2

area

3

slope

4

total volume

11

Multiple Choice

The change in elevation on a 100′ run of pipe with a 6% slope is ___′.

1

2

2

4

3

6

4

8

12

Multiple Choice

On plan views, vertical waste pipes are indicated with open ___ and architectural notes.

1

circles

2

ovals

3

rectangles

4

squares

13

Multiple Choice

A ___ system is a system that uses water, steam, or another liquid to condition the building spaces.

1

forced air

2

recirculating water

3

hydronic

4

combination heating

14

Multiple Choice

A ___ system is a system that uses the circulation of warm or cool air to condition building spaces.

1

central forced-air

2

forced-air

3

duel duct

4

high pressure gas

15

Multiple Choice

An ___ allows the water in a hydronic heating system to expand without raising the water pressure to dangerous levels.

1

condensate return tank

2

liquid receiver

3

expansion tank

4

chiller

16

Multiple Choice

___-pipe systems are used in medium- to large-size residential and commercial buildings.

1

One

2

Two

3

Three

4

Four

17

Multiple Choice

A ___ is a mechanical device that compresses refrigerant.

1

chiller

2

air handler

3

air conditioner

4

compressor

18

Multiple Choice

A ___ is a cover for the end of a portion of ductwork consisting of horizontal slats that allow for the passage of air and prevent rain or other objects from entering the ductwork.

1

air filter

2

grille

3

louver

4

register

19

Multiple Choice

Pipe is taken off and entered into a ledger sheet, spreadsheet, or estimating program based on ___ of each pipe for each diameter and pipe material.

1

linear feet

2

square feet

3

square meters

4

square yards

20

Multiple Choice

Natural gas and oil have efficiency ratings of ___% to 80%.

1

50

2

65

3

70

4

75

21

Multiple Choice

Electricity has an efficiency rating of ___% to 100%.

1

75

2

80

3

90

4

95

22

Multiple Choice

Registers, grilles, louvers, and filters are taken off ___.

1

as individual items

2

based on item weight

3

material type

4

in measured quantities

23

Chapter 14:

Some text here about the topic of discussion

24

Multiple Choice

___ is permitted for use in all atmospheric conditions and types of occupancies.

1

PVC conduit

2

Electrical metallic tubing (EMT)

3

Flexible metal conduit (FMC)

4

Rigid metal conduit (RMC)

25

Multiple Choice

___ is commonly used for wiring electrical fixtures.

1

Junior hard service cord (SJ)

2

Thermoplastic-covered fixture wire (TF)

3

Nonmetallic sheathed cable (NM)

4

Moisture- and heat-resistance thermoplastic wire (THW)

26

Multiple Choice

A ___ receptacle is a device with a disconnect that interrupts the flow of current when a ground fault exceeding a predetermined value of current occurs.

1

duplex

2

ground-fault circuit interrupter (GFCI)

3

clock hanger

4

arc-fault interrupter (AFCI)

27

Multiple Choice

Symbols and abbreviations on ___ indicate connection locations for all the various communications devices that are installed in conjunction with these systems.

1

floor plans

2

detail drawings

3

mechanical prints

4

electrical prints

28

Multiple Choice

___ luminaires are fastened to walls, ceilings, or other structural members.

1

Recessed

2

Ceiling-mounted

3

Surface-mounted

4

Bracket-mounted

29

Multiple Choice

___ luminaires are designed so that the housing is behind the surface of the finish material, leaving the face of the fixture flush with the finish surface.

1

Bracket-mounted

2

Ceiling-mounted

3

Surface-mounted

4

Recessed

30

Multiple Choice

A ___ is an electric device that uses electromagnetism to change voltage from one level to another.

1

transformer

2

panelboard

3

busway

4

circuit breaker

31

Multiple Choice

___ is composed of a frame along which multiple lamp receptacles are mounted.

1

Track lighting

2

Recessed luminaires

3

Surface-mounted luminaires

4

Bracket-mounted fixtures

32

Multiple Choice

___ allow for directional adjustment of lights and are commonly used for floodlights.

1

Surface-mounted luminaires

2

Bracket-mounted fixtures

3

Track lighting

4

Recessed luminaires

33

Multiple Choice

A(n) ___ lamp is a low-pressure discharge lamp in which ionization of mercury vapor transforms ultraviolet energy generated by the discharge into light.

1

incandescent

2

fluorescent

3

metal halide

4

high-intensity discharge (HID)

34

Multiple Choice

When installed in the proper applications, ___ lamps have a longer service life than other types of lamps.

1

high-intensity discharge (HID)

2

fluorescent

3

light-emitting diode (LED)

4

metal-halide

35

Multiple Choice

Solar panels are rated according to the amount of power generated, commonly between 100 W to ___ W.

1

250

2

300

3

365

4

475

36

Multiple Choice

___ inverters are installed at each solar panel to convert DC power to AC power at the source, eliminating the need for any further inverters.

1

Central

2

Micro

3

String

4

Battery-based

37

Multiple Choice

___ inverters require a battery to operate and allow for a bidirectional flow of current where a system is also connected to a power-grid system.

1

Micro

2

String

3

Battery-based

4

Central

38

Multiple Choice

Wind-power systems utilize a ___ or blade-type device that spins due to naturally occurring winds and turns a generator.

1

battery array

2

turbine

3

panel system

4

generator

39

Multiple Choice

In a(n) ___ system, when the main power source fails, an automatic transfer switch transfers the power source to the alternate power system.

1

communications

2

security

3

alarm

4

emergency-power

40

Multiple Choice

With ___, a list showing each type of material required is created.

1

lump sum pricing

2

detail takeoff

3

unit cost pricing

4

averaging takeoff

41

Multiple Choice

___ takeoff is a simplified electrical takeoff method where material and labor costs are calculated as an average cost per outlet.

1

Detail

2

Quantity

3

Averaging

4

Collective

42

Multiple Choice

___ is a method where each type of fixture is priced individually.

1

Detail takeoff

2

Quantity cost pricing

3

Unit cost pricing

4

Traditional estimating method

43

Multiple Choice

In some instances, estimators may determine if there are ___ available for solar-power system installations that may offset a portion of the system costs.

1

local monetary incentives

2

energy renewal rewards

3

governmental discounts

4

tax credit opportunities

44

Chapter 15:

Some text here about the topic of discussion

45

Multiple Choice

A(n) ___ partition is a panel or partition that is moved by hand or motor along an overhead track.

1

wire mesh

2

portable

3

demountable

4

operable

46

Multiple Choice

___ partitions are fastened to adjoining permanent construction and can be moved with a minimal amount of damage to the supporting structure.

1

Operable

2

Demountable

3

Wire mesh

4

Portable

47

Multiple Choice

Prefinished floor panels are commonly manufactured in ___″ squares.

1

12

2

16

3

18

4

24

48

Multiple Choice

___ allow airflow from one area to another while providing a level of weather protection, visual protection, or security.

1

Grilles

2

Registers

3

Louvers

4

Air filters

49

Multiple Choice

The ___ method is used to enter the quantity of each type of food service equipment into the proper ledger sheet, spreadsheet, or estimating program.

1

unit takeoff

2

quantity takeoff

3

averaging takeoff

4

detail takeoff

50

Multiple Choice

The chief estimator for the project should contact the ___ and owner immediately prior to submitting the bid to ensure that the most current addenda and all changes to the project are included in the bid.

1

project manager

2

architect

3

general contractor

4

authority having jurisdiction

51

Multiple Choice

A ___ is a monetary amount used as a temporary placeholder in an estimate during bid development.

1

placeholder

2

fixed rate

3

plug number

4

rough estimate

52

Multiple Choice

A common estimating error in bidding is unintentionally ___ in the bid.

1

over pricing items

2

omitting one or more items

3

under pricing items

4

combining unlike subcontractor bids

53

Multiple Choice

To ensure that the bid is complete and as low as necessary to win the work, a ___ may be used.

1

ledger sheet

2

chart

3

graph

4

checklist

54

Multiple Choice

When subcontractors or suppliers make final changes to their pricing, ___ systems show the original pricing and the revised pricing for each change, including the name of the subcontractor or supplier.

1

cost-plus

2

cut-and-add

3

value engineering

4

detail takeoff

55

Multiple Choice

In ___ construction work, the owner and architect may review the final bid documents with the contractor to determine if there are areas for cost savings.

1

long-span

2

value engineering

3

combination

4

negotiated

56

Multiple Choice

___ is a process whereby the owner and contractor agree on changes to the original design documents or construction processes that will result in a comparable finished construction project with some substitutions and cost savings.

1

Commisioning

2

Value engineering

3

Negotiated construction

4

Cut-and-add

57

Multiple Choice

___ may have a significant impact on overhead costs for various types of insurance and bonding coverage.

1

Liens

2

Risk quota

3

Arbitration

4

Risk allocation

58

Multiple Choice

A(n) ___ is any changes to the construction project requested by the owner, contractor, or subcontractor.

1

schedule of values

2

change order

3

addenda

4

punch list

59

Multiple Choice

___ quantities and types may also help indicate areas where improvements in the estimating and bidding processes can be realized.

1

Addendum

2

Asset

3

Change order

4

Hard cost

60

Multiple Choice

Variances in ___ costs in relation to the original estimate should be carefully tracked.

1

hard

2

overhead

3

soft

4

material

61

Multiple Choice

All materials used on the construction project should be allocated to a particular account and job-site operation, commonly referred to as cost codes, work codes, or the ___.

1

calculated work schedule (CWS)

2

estimated cost checklist (ECC)

3

work breakdown structure (WBS)

4

combined work bid (CWB)

62

Multiple Choice

Cases where material takeoff quantities ___ from actual materials required for construction may indicate excessive waste, theft, items missed on the takeoff, inaccurate quantities being delivered, or improper waste percentages applied in the estimating formulas.

1

decrease

2

increase

3

vary partially

4

vary greatly

63

Multiple Choice

Labor production rates and costs must be tracked in conjunction with the construction ___ throughout the construction process to ensure minimal variance from the original labor estimate.

1

owner

2

general contractor

3

subcontractors

4

project manager

64

Multiple Choice

Labor costs should be allocated according to ___ in a manner similar to materials.

1

labor schedules

2

cost codes

3

labor allocation charts

4

labor records

Exam 3 Chapters: 13-15

By Jeremiah Arnett

Show answer

Auto Play