4 Slides • 60 Questions
1
Exam 3 Chapters: 13-15
By Jeremiah Arnett
2
Chapter 13:
Some text here about the topic of discussion
3
Multiple Choice
Type ___ copper pipe is used for drain, waste, and vent applications.
G
M
DWV
K
4
Multiple Choice
The most common iron from which cast iron soil pipe and fittings are produced is ___ iron.
white
ductile
gray
malleable
5
Multiple Choice
___ pipe is available in cementing-only grades or in cementing or threading grades.
PEX
Cast iron
Copper
PVC
6
Multiple Choice
___ pipes branch off from the liquid-carrying waste pipes and commonly terminate above the roofline.
Process
Vent
Supply
Commercial
7
Multiple Choice
Materials for ___ piping include copper, PVC, and PEX.
waste
process
vent
supply
8
Multiple Choice
As a general rule, the installation costs for a basic plumbing fixture may be taken as ___% of the total fixture cost.
25
30
45
50
9
Multiple Choice
For high-quality fixtures and materials, a rate of approximately ___% of the total fixture cost is used for determining labor costs.
25
30
40
50
10
Multiple Choice
Elevations for waste piping between the elevation reference points are indicated as a percentage of ___.
total cost
area
slope
total volume
11
Multiple Choice
The change in elevation on a 100′ run of pipe with a 6% slope is ___′.
2
4
6
8
12
Multiple Choice
On plan views, vertical waste pipes are indicated with open ___ and architectural notes.
circles
ovals
rectangles
squares
13
Multiple Choice
A ___ system is a system that uses water, steam, or another liquid to condition the building spaces.
forced air
recirculating water
hydronic
combination heating
14
Multiple Choice
A ___ system is a system that uses the circulation of warm or cool air to condition building spaces.
central forced-air
forced-air
duel duct
high pressure gas
15
Multiple Choice
An ___ allows the water in a hydronic heating system to expand without raising the water pressure to dangerous levels.
condensate return tank
liquid receiver
expansion tank
chiller
16
Multiple Choice
___-pipe systems are used in medium- to large-size residential and commercial buildings.
One
Two
Three
Four
17
Multiple Choice
A ___ is a mechanical device that compresses refrigerant.
chiller
air handler
air conditioner
compressor
18
Multiple Choice
A ___ is a cover for the end of a portion of ductwork consisting of horizontal slats that allow for the passage of air and prevent rain or other objects from entering the ductwork.
air filter
grille
louver
register
19
Multiple Choice
Pipe is taken off and entered into a ledger sheet, spreadsheet, or estimating program based on ___ of each pipe for each diameter and pipe material.
linear feet
square feet
square meters
square yards
20
Multiple Choice
Natural gas and oil have efficiency ratings of ___% to 80%.
50
65
70
75
21
Multiple Choice
Electricity has an efficiency rating of ___% to 100%.
75
80
90
95
22
Multiple Choice
Registers, grilles, louvers, and filters are taken off ___.
as individual items
based on item weight
material type
in measured quantities
23
Chapter 14:
Some text here about the topic of discussion
24
Multiple Choice
___ is permitted for use in all atmospheric conditions and types of occupancies.
PVC conduit
Electrical metallic tubing (EMT)
Flexible metal conduit (FMC)
Rigid metal conduit (RMC)
25
Multiple Choice
___ is commonly used for wiring electrical fixtures.
Junior hard service cord (SJ)
Thermoplastic-covered fixture wire (TF)
Nonmetallic sheathed cable (NM)
Moisture- and heat-resistance thermoplastic wire (THW)
26
Multiple Choice
A ___ receptacle is a device with a disconnect that interrupts the flow of current when a ground fault exceeding a predetermined value of current occurs.
duplex
ground-fault circuit interrupter (GFCI)
clock hanger
arc-fault interrupter (AFCI)
27
Multiple Choice
Symbols and abbreviations on ___ indicate connection locations for all the various communications devices that are installed in conjunction with these systems.
floor plans
detail drawings
mechanical prints
electrical prints
28
Multiple Choice
___ luminaires are fastened to walls, ceilings, or other structural members.
Recessed
Ceiling-mounted
Surface-mounted
Bracket-mounted
29
Multiple Choice
___ luminaires are designed so that the housing is behind the surface of the finish material, leaving the face of the fixture flush with the finish surface.
Bracket-mounted
Ceiling-mounted
Surface-mounted
Recessed
30
Multiple Choice
A ___ is an electric device that uses electromagnetism to change voltage from one level to another.
transformer
panelboard
busway
circuit breaker
31
Multiple Choice
___ is composed of a frame along which multiple lamp receptacles are mounted.
Track lighting
Recessed luminaires
Surface-mounted luminaires
Bracket-mounted fixtures
32
Multiple Choice
___ allow for directional adjustment of lights and are commonly used for floodlights.
Surface-mounted luminaires
Bracket-mounted fixtures
Track lighting
Recessed luminaires
33
Multiple Choice
A(n) ___ lamp is a low-pressure discharge lamp in which ionization of mercury vapor transforms ultraviolet energy generated by the discharge into light.
incandescent
fluorescent
metal halide
high-intensity discharge (HID)
34
Multiple Choice
When installed in the proper applications, ___ lamps have a longer service life than other types of lamps.
high-intensity discharge (HID)
fluorescent
light-emitting diode (LED)
metal-halide
35
Multiple Choice
Solar panels are rated according to the amount of power generated, commonly between 100 W to ___ W.
250
300
365
475
36
Multiple Choice
___ inverters are installed at each solar panel to convert DC power to AC power at the source, eliminating the need for any further inverters.
Central
Micro
String
Battery-based
37
Multiple Choice
___ inverters require a battery to operate and allow for a bidirectional flow of current where a system is also connected to a power-grid system.
Micro
String
Battery-based
Central
38
Multiple Choice
Wind-power systems utilize a ___ or blade-type device that spins due to naturally occurring winds and turns a generator.
battery array
turbine
panel system
generator
39
Multiple Choice
In a(n) ___ system, when the main power source fails, an automatic transfer switch transfers the power source to the alternate power system.
communications
security
alarm
emergency-power
40
Multiple Choice
With ___, a list showing each type of material required is created.
lump sum pricing
detail takeoff
unit cost pricing
averaging takeoff
41
Multiple Choice
___ takeoff is a simplified electrical takeoff method where material and labor costs are calculated as an average cost per outlet.
Detail
Quantity
Averaging
Collective
42
Multiple Choice
___ is a method where each type of fixture is priced individually.
Detail takeoff
Quantity cost pricing
Unit cost pricing
Traditional estimating method
43
Multiple Choice
In some instances, estimators may determine if there are ___ available for solar-power system installations that may offset a portion of the system costs.
local monetary incentives
energy renewal rewards
governmental discounts
tax credit opportunities
44
Chapter 15:
Some text here about the topic of discussion
45
Multiple Choice
A(n) ___ partition is a panel or partition that is moved by hand or motor along an overhead track.
wire mesh
portable
demountable
operable
46
Multiple Choice
___ partitions are fastened to adjoining permanent construction and can be moved with a minimal amount of damage to the supporting structure.
Operable
Demountable
Wire mesh
Portable
47
Multiple Choice
Prefinished floor panels are commonly manufactured in ___″ squares.
12
16
18
24
48
Multiple Choice
___ allow airflow from one area to another while providing a level of weather protection, visual protection, or security.
Grilles
Registers
Louvers
Air filters
49
Multiple Choice
The ___ method is used to enter the quantity of each type of food service equipment into the proper ledger sheet, spreadsheet, or estimating program.
unit takeoff
quantity takeoff
averaging takeoff
detail takeoff
50
Multiple Choice
The chief estimator for the project should contact the ___ and owner immediately prior to submitting the bid to ensure that the most current addenda and all changes to the project are included in the bid.
project manager
architect
general contractor
authority having jurisdiction
51
Multiple Choice
A ___ is a monetary amount used as a temporary placeholder in an estimate during bid development.
placeholder
fixed rate
plug number
rough estimate
52
Multiple Choice
A common estimating error in bidding is unintentionally ___ in the bid.
over pricing items
omitting one or more items
under pricing items
combining unlike subcontractor bids
53
Multiple Choice
To ensure that the bid is complete and as low as necessary to win the work, a ___ may be used.
ledger sheet
chart
graph
checklist
54
Multiple Choice
When subcontractors or suppliers make final changes to their pricing, ___ systems show the original pricing and the revised pricing for each change, including the name of the subcontractor or supplier.
cost-plus
cut-and-add
value engineering
detail takeoff
55
Multiple Choice
In ___ construction work, the owner and architect may review the final bid documents with the contractor to determine if there are areas for cost savings.
long-span
value engineering
combination
negotiated
56
Multiple Choice
___ is a process whereby the owner and contractor agree on changes to the original design documents or construction processes that will result in a comparable finished construction project with some substitutions and cost savings.
Commisioning
Value engineering
Negotiated construction
Cut-and-add
57
Multiple Choice
___ may have a significant impact on overhead costs for various types of insurance and bonding coverage.
Liens
Risk quota
Arbitration
Risk allocation
58
Multiple Choice
A(n) ___ is any changes to the construction project requested by the owner, contractor, or subcontractor.
schedule of values
change order
addenda
punch list
59
Multiple Choice
___ quantities and types may also help indicate areas where improvements in the estimating and bidding processes can be realized.
Addendum
Asset
Change order
Hard cost
60
Multiple Choice
Variances in ___ costs in relation to the original estimate should be carefully tracked.
hard
overhead
soft
material
61
Multiple Choice
All materials used on the construction project should be allocated to a particular account and job-site operation, commonly referred to as cost codes, work codes, or the ___.
calculated work schedule (CWS)
estimated cost checklist (ECC)
work breakdown structure (WBS)
combined work bid (CWB)
62
Multiple Choice
Cases where material takeoff quantities ___ from actual materials required for construction may indicate excessive waste, theft, items missed on the takeoff, inaccurate quantities being delivered, or improper waste percentages applied in the estimating formulas.
decrease
increase
vary partially
vary greatly
63
Multiple Choice
Labor production rates and costs must be tracked in conjunction with the construction ___ throughout the construction process to ensure minimal variance from the original labor estimate.
owner
general contractor
subcontractors
project manager
64
Multiple Choice
Labor costs should be allocated according to ___ in a manner similar to materials.
labor schedules
cost codes
labor allocation charts
labor records
Exam 3 Chapters: 13-15
By Jeremiah Arnett
Show answer
Auto Play
Slide 1 / 64
SLIDE
Similar Resources on Wayground
58 questions
PEMBINAAN MANDARIN MATTHEW 9
Presentation
•
KG - University
58 questions
Bahasa Inggris 2 Meeting 9 and 10
Presentation
•
University
60 questions
Bahasa Inggris I Week 13
Presentation
•
University
58 questions
Media Pembelaran
Presentation
•
University
58 questions
Quizz technique décembre 2025
Presentation
•
KG - University
58 questions
CPhT Week 7 Review
Presentation
•
KG - University
59 questions
IELTS - NAMES AND NUMBERS
Presentation
•
University
60 questions
What is information technology
Presentation
•
University
Popular Resources on Wayground
20 questions
Math Review
Quiz
•
3rd Grade
15 questions
Fast food
Quiz
•
7th Grade
20 questions
Context Clues
Quiz
•
6th Grade
20 questions
Inferences
Quiz
•
4th Grade
19 questions
Classifying Quadrilaterals
Quiz
•
3rd Grade
20 questions
Figurative Language Review
Quiz
•
6th Grade
20 questions
Equivalent Fractions
Quiz
•
3rd Grade
10 questions
Identify Fractions, Mixed Numbers & Improper Fractions
Quiz
•
3rd - 4th Grade
Discover more resources for Architecture
20 questions
Guess The App
Quiz
•
KG - Professional Dev...
11 questions
NFL Football logos
Quiz
•
KG - Professional Dev...
19 questions
Minecraft
Quiz
•
6th Grade - Professio...
40 questions
8th Grade Math Review
Quiz
•
8th Grade - University
20 questions
Block Buster Movies
Quiz
•
10th Grade - Professi...
10 questions
Would you rather...
Quiz
•
KG - University
40 questions
Flags of the World
Quiz
•
KG - Professional Dev...
14 questions
Superhero
Quiz
•
1st Grade - University