Develop a Project Plan
Presentation
•
Professional Development
•
University
•
Practice Problem
•
Hard
Ryan Gente
Used 3+ times
FREE Resource
116 Slides • 0 Questions
1
​Develop a Project Plan
2
Develop a Project Plan
3
Project planning
Is the process of defining the objectives, scope, and deliverables of a project, as well as identifying the tasks, resources, and timelines required to achieve those objectives. A well-planned project provides a roadmap for all stakeholders involved in the project, including the project team, sponsors, and clients.
4
Project planning
Define the project scope - Clearly define the scope of the project, including the objectives, deliverables, timelines, and budget.
Identify stakeholders - Identify the stakeholders who will be impacted by the project, including sponsors, customers, employees, and other relevant parties.
5
Project planning
Develop a project plan - Develop a detailed project plan that outlines the activities, resources, and timelines required to achieve the project objectives.
Identify project risks - Identify potential risks associated with the project, such as budget overruns, schedule delays, or quality issues.
6
Project planning
Obtain stakeholder buy-in - Engage stakeholders to obtain their buy-in and support for the project. This can include presenting the project plan and business case, answering questions, and addressing concerns.
Obtain approval - Obtain approval from the relevant stakeholders, such as sponsors, executives, or steering committees. This may involve presenting the project plan and business case to a decision-making body, such as a board of directors.
7
Project planning
Develop a risk management plan - Develop a risk management plan that outlines strategies for mitigating potential risks and how to respond to unexpected events.
Develop a business case - Develop a business case that outlines the benefits of the project, including the expected return on investment, improved customer satisfaction, or increased efficiency.
8
Project planning
Communicate the decision - Communicate the decision to proceed to all relevant stakeholders, including employees, customers, and suppliers. This should include a clear statement of the project objectives, timelines, and expected outcomes.
Monitor progress - Monitor progress throughout the project to ensure that it stays on track and meets the expected outcomes. This can include regular reporting, status updates, and stakeholder engagement.
9
Work Breakdown Structure (WBS)
10
Work Breakdown Structure (WBS)
Is a hierarchical decomposition of a project into smaller, more manageable tasks. It is a visual representation of the project's deliverables, organized in a logical structure, that breaks down the project work into smaller, more manageable pieces.
11
Work Breakdown Structure (WBS)
The WBS is an essential tool in project management as it helps to ensure that all the project's deliverables are identified and that all the required tasks are included in the project plan. It is typically created during the planning phase of the project, and it is used as a basis for scheduling, estimating, tracking, and reporting progress.
12
Work Breakdown Structure (WBS)
The WBS divides the project into smaller, more manageable work packages. The work packages are broken down into smaller and more specific tasks, enabling the project team to plan and manage the project's execution more effectively. The WBS also helps to ensure that all project stakeholders have a common understanding of the project's scope and deliverables.
13
The WBS typically includes the following components:
The highest level of the WBS is the project deliverable or objective.
The second level of the WBS is the project phases or major deliverables.
The third level of the WBS is the sub-deliverables or work packages required to complete the project phases.
The fourth level of the WBS is the individual tasks required to complete each work package.
14
Work Breakdown Structure (WBS)
The WBS is a critical tool in project management as it helps to ensure that all the required work is included in the project plan, and it provides a structure for tracking and reporting progress throughout the project's lifecycle.
15
Build a work breakdown structure
16
Build a work breakdown structure
A WBS is a hierarchical decomposition of a project into smaller, more manageable components. It helps to organize and clarify the work that needs to be done and helps ensure that all project deliverables are accounted for.
17
Build a work breakdown structure
Project
1.1 Requirements gathering
1.1.1 Meet with stakeholders
1.1.2 Define project goals and objectives
1.1.3 Create user stories
18
Build a work breakdown structure
1.2 Design
1.2.1 Develop system architecture
1.2.2 Create wireframes and UI mockups
1.2.3 Develop database schema
19
Build a work breakdown structure
1.3 Development
1.3.1 Develop backend functionality
1.3.2 Develop frontend functionality
1.3.3 Integrate with third-party APIs
20
Build a work breakdown structure
1.4 Testing
1.4.1 Unit testing
1.4.2 Integration testing
1.4.3 User acceptance testing
21
Build a work breakdown structure
1.5 Deployment
1.5.1 Configure server environment
1.5.2 Deploy to production server
1.5.3 Perform final testing
22
Build a work breakdown structure
1.6 Maintenance
1.6.1 Monitor system performance
1.6.2 Address bug reports
1.6.3 Implement feature requests
23
How to create work packages
24
How to create work packages
Define the scope of each work package - Once the project is broken down into smaller components, the scope of each work package needs to be defined. This involves identifying the specific deliverables and objectives that need to be achieved in each work package.
25
How to create work packages
Estimate the time and effort required for each work package - Accurately estimating the time and effort required for each work package is important for effective project planning. This involves breaking down each work package into individual tasks and estimating the time and effort required for each task.
26
How to create work packages
Assign a unique identifier to each work package - Assigning a unique identifier to each work package helps to track progress and ensure that all work packages are accounted for. This identifier can be a number or a code that is unique to each work package.
27
How to create work packages
Define dependencies between work packages - Work packages are often dependent on each other, and it's important to identify these dependencies to ensure that work is completed in the correct order. This involves identifying the sequence in which work packages need to be completed to achieve project objectives.
28
How to create work packages
Create a work package description - A work package description provides a detailed overview of the work package, including the scope, objectives, deliverables, and resources required. This description should be clear and concise, and should include any relevant information for completing the work package.
29
How to create work packages
Review and refine the work packages - Once the work packages have been defined, it's important to review and refine them to ensure that they are accurate and complete. This may involve seeking input from stakeholders or subject matter experts, and making adjustments as needed.
30
Estimate time and cost a project
31
Estimate time and cost a project
Estimating the time and cost of a project can be a challenging task, but it's crucial for ensuring the success of the project. Here are some steps you can take to estimate the time and cost of a project:
32
Estimate time and cost a project
Define the project scope - This involves defining the objectives, deliverables, timelines, and budget for the project. It helps ensure that all stakeholders have a clear understanding of what the project is intended to achieve.
Identify the tasks - This involves breaking down the project into smaller components and identifying the specific tasks that need to be completed to achieve project objectives.
33
Estimate time and cost a project
Estimate task duration - Accurately estimating the time required for each task is important for effective project planning. This involves breaking down each task into smaller components and estimating the time required for each component.
Allocate resources - Resources refer to the people, equipment, and materials required to execute the project plan. It is important to ensure that adequate resources are available and allocated appropriately to achieve project objectives.
34
Estimate time and cost a project
Calculate the total project cost - Calculating the total project cost involves estimating the cost of each task and resource required to complete the project. This helps ensure that the project stays within budget.
Develop a project schedule - The project schedule outlines the timeline for completing each task and achieving project objectives. It helps ensure that the project stays on track and is completed on time.
35
Estimate time and cost a project
Monitor and adjust - Monitoring and adjusting involves tracking project progress and making adjustments to the project plan as needed. Regular monitoring and control helps ensure that the project stays on track and meets its objectives.
36
How to choose the best estimate
37
How to choose the best estimate
Evaluate the accuracy of the estimate - This involves assessing the accuracy of the estimate by comparing it to historical data, industry standards, or expert opinions. The accuracy of the estimate is critical to ensuring that the project is completed within budget and on time.
38
How to choose the best estimate
Consider the risks involved - When evaluating estimates, it's important to consider the potential risks involved in the project. This includes identifying potential risks and developing strategies to mitigate those risks.
39
How to choose the best estimate
Evaluate available resources - Available resources, including personnel, equipment, and materials, are critical to the success of the project. When evaluating estimates, it's important to assess the availability and suitability of resources for the project.
40
How to choose the best estimate
Consider the experience of the estimator - The experience of the estimator can impact the accuracy of the estimate. When evaluating estimates, it's important to consider the experience and expertise of the estimator.
41
How to choose the best estimate
Evaluate alternative estimates - It's important to evaluate alternative estimates to ensure that the estimate chosen is the most accurate and appropriate for the project. This may involve comparing estimates from multiple sources or using different estimation methods.
42
How to choose the best estimate
Choose the estimate that best balances accuracy, risk, and available resources - When choosing an estimate, it's important to balance accuracy with the potential risks involved and the available resources. The estimate chosen should be realistic, achievable, and aligned with the overall goals and objectives of the project.
43
Create a resource management plan
44
Create a resource management plan
A resource management plan is a document that outlines how project resources will be allocated, monitored, and controlled throughout the project lifecycle. Here are the steps you can follow to create a resource management plan:
45
Create a resource management plan
Identify project resources - This involves identifying the resources required to complete the project successfully. Project resources can include personnel, equipment, materials, and facilities needed to accomplish project tasks.
46
Create a resource management plan
Determine resource roles and responsibilities - Once project resources have been identified, it's important to determine the roles and responsibilities of each resource. This helps ensure that each resource is utilized effectively and efficiently.
47
Create a resource management plan
Develop a resource allocation plan - A resource allocation plan outlines how project resources will be allocated to specific tasks and activities. This helps ensure that resources are utilized effectively and efficiently.
48
Create a resource management plan
Create a resource utilization plan - A resource utilization plan outlines how project resources will be utilized to ensure that they are used as efficiently as possible. This includes identifying times when resources are not being utilized and identifying ways to allocate those resources to other tasks.
49
Create a resource management plan
Establish a resource monitoring and control plan - A resource monitoring and control plan involves tracking resource usage and making adjustments as needed. This helps ensure that resources are being used effectively and efficiently throughout the project.
50
Create a resource management plan
Develop a resource contingency plan - A resource contingency plan outlines alternative strategies for managing resources if unexpected events occur. This helps ensure that project resources can be utilized effectively even in the face of unforeseen challenges.
51
Create a resource management plan
Define resource reporting requirements - Resource reporting requirements specify how project resources will be reported and tracked throughout the project. This helps ensure that project managers have up-to-date information on resource usage and can make informed decisions about resource allocations.
52
Create a resource management plan
Obtain necessary approvals - Before implementing a resource management plan, it's important to obtain necessary approvals from stakeholders, including sponsors, executives, or steering committees. This ensures that project resources are being managed in accordance with organizational policies and procedures.
53
Create a resource management plan
Implement the resource management plan - Once a resource management plan has been developed, it's important to implement the plan and track resource usage throughout the project. This involves monitoring resource usage, making adjustments as needed, and communicating resource usage to stakeholders.
54
Build a project schedule
55
Build a project schedule
Define project milestones - Project milestones are significant events or achievements that mark progress towards project objectives. Defining project milestones helps track progress and ensure that the project stays on track.
Identify project tasks - Project tasks are specific activities or actions required to achieve project objectives. Identifying project tasks helps ensure that all necessary work is accounted for and that the project is broken down into manageable components.
56
Build a project schedule
Determine task dependencies - Task dependencies refer to the relationships between tasks, including which tasks must be completed before others can begin. Identifying task dependencies helps ensure that tasks are completed in the correct order and that the project stays on track.
57
Build a project schedule
Estimate task duration - Accurately estimating the time required for each task is important for effective project planning. This involves breaking down each task into smaller components and estimating the time required for each component.
58
Build a project schedule
Determine resource requirements - Resource requirements refer to the personnel, equipment, and materials needed to complete each task. Determining resource requirements helps ensure that adequate resources are available and allocated appropriately to achieve project objectives.
59
Build a project schedule
Develop a project network diagram - A project network diagram is a visual representation of the project tasks and their dependencies. Developing a project network diagram helps identify the most critical tasks and ensure that the project is completed in the correct order.
60
Build a project schedule
Determine the critical path - The critical path is the sequence of tasks that must be completed on time to ensure that the project is completed on schedule. Identifying the critical path helps project managers prioritize tasks and allocate resources effectively.
61
Build a project schedule
Develop a Gantt chart - A Gantt chart is a visual representation of the project schedule, showing the start and end dates for each task. Developing a Gantt chart helps ensure that the project stays on track and that all tasks are completed on time.
62
Build a project schedule
Review and refine the schedule - Regularly reviewing and refining the schedule helps identify potential issues or delays and allows project managers to make adjustments as needed. This helps ensure that the project stays on track and is completed on time and within budget.
63
Build a project schedule
Obtain necessary approvals - Before implementing the project schedule, it's important to obtain necessary approvals from stakeholders, including sponsors, executives, or steering committees. This ensures that the project schedule is aligned with organizational policies and procedures.
64
Develop a project budget
65
Build a project schedule
Developing a project budget involves identifying all the resources required for the project and estimating the cost of each resource.
66
Build a project schedule
Define the project scope and objectives - Defining the project scope and objectives involves identifying the goals, deliverables, timelines, and budget for the project. This helps ensure that all stakeholders have a clear understanding of what the project is intended to achieve.
67
Build a project schedule
Identify the tasks - Identifying the tasks involves breaking down the project into smaller components and identifying the specific tasks that need to be completed to achieve project objectives.
68
Build a project schedule
Estimate the resources - Estimating the resources involves identifying the personnel, equipment, and materials required to complete each task. This helps ensure that adequate resources are available and allocated appropriately to achieve project objectives.
69
Build a project schedule
Determine the cost of resources - Determining the cost of resources involves estimating the cost of personnel, equipment, and materials needed to complete each task. This helps ensure that the project stays within budget.
Add up the costs - Adding up the costs involves totaling the cost of all resources required to complete the project. This helps ensure that the project is completed within budget.
70
Build a project schedule
Add contingency - Adding contingency involves including additional funds in the project budget to cover unexpected expenses or delays. This helps ensure that the project can continue even if unexpected challenges arise.
71
Build a project schedule
Calculate the total project cost - Calculating the total project cost involves estimating the cost of all resources required to complete the project. This includes personnel, equipment, materials, and any other expenses related to the project.
Review the budget - Reviewing the budget involves assessing the accuracy and completeness of the estimated costs and ensuring that the budget aligns with project objectives and timelines.
72
Build a project schedule
Track and monitor the budget - Tracking and monitoring the budget involves regularly monitoring expenses and comparing them to the estimated costs. This helps ensure that the project stays within budget and that any deviations from the budget are identified and addressed promptly.
73
Build a project schedule
Communicate the budget - Communicating the budget involves sharing information about the budget with stakeholders, including sponsors, executives, and project team members. This helps ensure that everyone involved in the project has a clear understanding of the budget and can make informed decisions about resource allocations and project priorities.
74
Identify risks
75
Identify risks
To identify risks for a capstone project, I would need more information about the specific project.
76
Identify risks
Scope creep - Scope creep is the gradual or uncontrolled expansion of a project's scope beyond its original objectives or boundaries. Scope creep can result in increased costs, delays, and a failure to meet project objectives.
Resource constraints - Resource constraints refer to limitations on the personnel, equipment, or materials available to complete a project. Resource constraints can impact project timelines, deliverables, and overall success.
77
Identify risks
Stakeholder expectations - refer to the needs, goals, and requirements of individuals or groups involved in or affected by the project. Meeting stakeholder expectations is critical to project success and requires effective communication and collaboration.
78
Identify risks
Technical challenges - refer to difficulties or obstacles related to the design, development, or implementation of project solutions. Technical challenges can impact project timelines, budgets, and overall success and require creative problem-solving and technical expertise.
79
Identify risks
Team dynamics - Team dynamics refer to the interactions, communication, and relationships among project team members. Effective team dynamics are critical to project success and require effective leadership, communication, and collaboration.
External factors - External factors refer to events or circumstances beyond the control of the project team that can impact project timelines, budgets, and overall success. Examples of external factors include changes in laws or regulations, market conditions, or natural disasters.
80
Create a risk management plan
81
Create a risk management plan
Risk Identification - Risk identification involves identifying potential risks that could impact the project's objectives, timelines, budget, or quality. Project managers can use various techniques to identify risks, such as brainstorming, SWOT analysis, or risk checklists.
82
Create a risk management plan
Risk Assessment - Risk assessment involves analyzing the identified risks to determine their likelihood of occurring and their potential impact on the project. This involves assigning a probability and severity rating to each risk to prioritize them for further analysis and potential mitigation.
83
Create a risk management plan
Risk Mitigation - Risk mitigation involves developing and implementing strategies to reduce the likelihood and impact of identified risks. This can include avoiding, transferring, mitigating, or accepting risks as part of the project plan.
84
Create a risk management plan
Risk Monitoring - Risk monitoring involves tracking and reviewing identified risks throughout the project's lifecycle to ensure that the mitigation strategies are effective and identify new risks as they arise. This involves regular reviews of risk registers and potential triggers that may indicate changes in the risk profile.
85
Create a risk management plan
Risk Communication - Risk communication involves sharing information about identified risks with stakeholders, including sponsors, executives, and project team members. Effective communication ensures that all stakeholders have a clear understanding of the project's risk profile, and can make informed decisions about resource allocations and project priorities.
86
Create a risk management plan
Risk Review - Involves evaluating the effectiveness of the risk management plan and identifying opportunities for continuous improvement. This involves documenting lessons learned and best practices, updating risk registers, and revising the risk management plan as needed.
87
Set up a communication plan
88
Set up a communication plan
A communication plan is a critical component of project management, as it outlines how project-related information will be shared among stakeholders. Here are the key steps to setting up a communication plan:
89
Set up a communication plan
Identify stakeholders - Identify all stakeholders who will be involved in or affected by the project, including project team members, sponsors, executives, customers, suppliers, and regulatory bodies.
90
Set up a communication plan
Determine communication objectives - Determine the communication objectives for each stakeholder group, including what information they need to know, how often they need to receive updates, and how the information will be delivered.
91
Set up a communication plan
Select communication channels - Identify the communication channels that will be used to deliver project-related information, such as email, project management software, video conferencing, or in-person meetings.
92
Set up a communication plan
Assign responsibilities - Assign responsibilities for communicating project-related information to specific individuals or groups, including project managers, team members, or stakeholders.
Establish a communication schedule - Establish a communication schedule that outlines when project-related information will be shared, how often, and through which communication channels.
93
Set up a communication plan
Develop communication templates - Develop communication templates, such as meeting agendas, progress reports, or email templates, to ensure that project-related information is communicated consistently and efficiently.
Monitor and update the communication plan - Monitor and update the communication plan regularly to ensure that it remains effective and relevant throughout the project's lifecycle.
94
Develop a quality plan
95
Develop a quality plan
Define the purpose and scope of the quality plan - Determine why you need a quality plan and what it should cover. Identify the stakeholders who will be involved in the quality plan, their needs, and expectations.
96
Develop a quality plan
Determine the quality standards - Identify the quality standards that apply to your project or organization. These may include industry standards, regulatory requirements, or internal policies and procedures.
97
Develop a quality plan
Identify the quality metrics - Determine the metrics that will be used to measure the quality of the project or product. These may include defect rates, customer satisfaction scores, or other relevant metrics.
98
Develop a quality plan
Establish quality objectives - Based on the quality standards and metrics, establish specific quality objectives that you want to achieve. These objectives should be measurable, achievable, relevant, and time-bound.
99
Develop a quality plan
Develop quality processes - Develop processes for ensuring that quality objectives are met. These processes should include quality assurance, quality control, and continuous improvement.
100
Develop a quality plan
Assign responsibilities - Assign responsibilities for implementing the quality plan to specific individuals or teams. Ensure that everyone involved in the project understands their role and responsibility in ensuring quality.
101
Develop a quality plan
Define quality training and communication - Develop a plan for providing training and communication to ensure that everyone involved in the project understands the quality plan, processes, and objectives.
102
Develop a quality plan
Monitor and measure quality - Establish a system for monitoring and measuring the quality of the project or product. This should include regular quality audits, reviews, and testing.
103
Develop a quality plan
Continuously improve - Establish a process for continuous improvement to ensure that the quality plan is effective and efficient. This should include regular reviews of the quality plan, processes, and objectives to identify areas for improvement.
104
Develop a quality plan
Review and update the quality plan - Regularly review and update the quality plan to ensure that it remains relevant and effective. This should include feedback from stakeholders, changes in quality standards or metrics, and changes in the project or organization.
105
How to set up a change management plan
106
How to set up a change management plan
Define the need for change - Identify the reasons why you need to make a change. This can include changes in the business environment, customer needs, or internal processes.
Identify stakeholders - Determine who will be impacted by the change and who needs to be involved in the change management process. This can include employees, customers, suppliers, and other stakeholders.
107
How to set up a change management plan
Develop a change management team - Set up a team to oversee the change management process. This team should include representatives from different areas of the organization, including management, operations, and IT.
Assess the impact of the change - Determine the potential impact of the change on the organization, including financial, operational, and employee impacts. This assessment should include a risk analysis to identify potential risks and mitigation strategies.
108
How to set up a change management plan
Develop a communication plan - Create a plan to communicate the change to all stakeholders. This should include a timeline, messaging, and communication channels.
Develop a training - plan to train employees on the new processes, tools, or systems implemented as part of the change.
109
How to set up a change management plan
Develop a testing plan - Develop a plan to test the new processes, tools, or systems before they are implemented. This should include a testing schedule, test cases, and a plan for addressing issues that arise during testing.
Implement the change - Implement the change according to the plan. This should include a timeline, milestones, and a plan for monitoring progress.
110
How to set up a change management plan
Monitor and evaluate the change - Regularly monitor and evaluate the change to ensure that it is achieving the desired results. This should include feedback from stakeholders and metrics to measure the success of the change.
Adjust the plan as needed - Based on feedback and evaluation, adjust the change management plan as needed to ensure that the change is successful.
111
How to plan procurement
112
How to plan procurement
Define the project scope - Determine what goods and services will be required for the project and create a list of procurement needs. Identify the stakeholders who will be involved in procurement, their needs, and expectations.
Determine the procurement strategy - Determine the best procurement strategy for the project, including whether to use competitive bidding, sole sourcing, or other methods. Consider factors such as cost, quality, and risk.
113
How to plan procurement
Develop procurement documents - Develop procurement documents, such as a request for proposal (RFP) or request for quotation (RFQ), that clearly outline the project requirements, evaluation criteria, and terms and conditions.
Identify potential suppliers - Identify potential suppliers who can provide the goods and services required for the project. This can include researching suppliers online, attending trade shows, or contacting industry associations.
114
How to plan procurement
Evaluate suppliers - Evaluate potential suppliers based on their ability to meet the project requirements, their experience, and their financial stability. Use a consistent evaluation process to ensure fairness and transparency.
Negotiate contracts - Negotiate contracts with selected suppliers that clearly outline the terms and conditions of the procurement, including pricing, delivery schedules, and quality requirements.
115
How to plan procurement
Monitor supplier performance - Monitor supplier performance to ensure that they are meeting the terms of the procurement contract. This can include regular performance reviews, site visits, and audits.
Manage procurement risks - Identify potential risks associated with procurement, such as delays in delivery or quality issues, and develop strategies to mitigate those risks.
116
How to plan procurement
Ensure compliance - Ensure that the procurement process is compliant with all relevant laws, regulations, and organizational policies and procedures.
Document procurement activities - Document all procurement activities, including the procurement process, supplier evaluations, and contract negotiations. This documentation can be used for future reference and to improve the procurement process.
​Develop a Project Plan
Show answer
Auto Play
Slide 1 / 116
SLIDE
Similar Resources on Wayground
108 questions
Wildlife and Exotic Radiology
Lesson
•
KG - University
114 questions
EPCC History 1302
Lesson
•
University
107 questions
Air Laws Recitation questions
Lesson
•
University
108 questions
9.1 KOMUNITI DAN EKOSISTEM
Lesson
•
12th Grade
114 questions
Types of Advertisement ESL
Lesson
•
Professional Development
107 questions
Cognitive Bias and Logical Fallacies
Lesson
•
12th Grade
106 questions
05 - Ocular Procedures
Lesson
•
Professional Development
110 questions
D'accord 3 Lesson 4
Lesson
•
KG - University
Popular Resources on Wayground
15 questions
Fractions on a Number Line
Quiz
•
3rd Grade
10 questions
Probability Practice
Quiz
•
4th Grade
15 questions
Probability on Number LIne
Quiz
•
4th Grade
20 questions
Equivalent Fractions
Quiz
•
3rd Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
22 questions
fractions
Quiz
•
3rd Grade
6 questions
Appropriate Chromebook Usage
Lesson
•
7th Grade
10 questions
Greek Bases tele and phon
Quiz
•
6th - 8th Grade
Discover more resources for Professional Development
12 questions
IREAD Week 4 - Review
Quiz
•
3rd Grade - University
20 questions
Endocrine System
Quiz
•
University
7 questions
Renewable and Nonrenewable Resources
Interactive video
•
4th Grade - University
30 questions
W25: PSYCH 250 - Exam 2 Practice
Quiz
•
University
5 questions
Inherited and Acquired Traits of Animals
Interactive video
•
4th Grade - University
20 questions
Implicit vs. Explicit
Quiz
•
6th Grade - University
7 questions
Comparing Fractions
Interactive video
•
1st Grade - University
38 questions
Unit 8 Review - Absolutism & Revolution
Quiz
•
10th Grade - University