Unit 306 self study 6 Risk assessment and method statements
Presentation
•
Professional Development
•
Professional Development
•
Easy
Plumbers Cymoedd
Used 3+ times
FREE Resource
2 Slides • 29 Questions
1
Unit 306 Self study
Part 5
Risk assessment and method statements
2
Click on the following link to open the text:
Unit 306 P6 Risk assessment & Method statements.pdf
then use the text to answer the questions that follow.
3
Multiple Choice
What is a risk assessment intended to provide?
Financial forecasts
Information to keep workers safe
Marketing insights
Employee performance reviews
4
Multiple Choice
What is the first step in the risk assessment process according to the HSE document?
Identify the hazards.
Decide who might be harmed and how.
Evaluate the risks and decide on precautions.
Record your findings and implement them.
5
Multiple Choice
Why is it important to identify who might be harmed in a risk assessment?
To ensure compliance with legal requirements.
To help identify the best way to manage the risk.
To reduce the cost of safety measures.
To avoid unnecessary paperwork.
6
Multiple Choice
What should be done if chlorination of a cold water storage cistern is carried out at the same time as other work?
Refer to COSHH data sheets for the chemicals.
Ignore the other work.
Stop the chlorination process.
Consult with a supervisor.
7
Multiple Choice
What is the purpose of a risk assessment according to the text?
To identify potential hazards and decide on precautions
To ensure all employees are wearing uniforms
To increase company profits
To reduce the number of employees
8
Multiple Choice
What is one method mentioned for reducing risks in a work area?
Using barriers around a work area
Increasing the number of employees
Reducing the work hours
Eliminating all safety equipment
9
Multiple Choice
What should be done with the results of a risk assessment?
Write them down and share with the team
Ignore them if there are fewer than ten employees
Keep them confidential
Only share with upper management
10
Multiple Choice
What is a potential risk when working with existing pipework?
The presence of asbestos
The need for more employees
The increase in water pressure
The decrease in temperature
11
Multiple Choice
What is a risk calculation formula used for?
To determine the cost of a project
To assign a number to each risk
To calculate the time needed for a task
To evaluate the quality of materials
12
Multiple Choice
What does a quantitative approach involve in risk assessment?
Estimating the cost of materials
Ranking risks with a number
Evaluating the skills of workers
Scheduling maintenance tasks
13
Multiple Choice
According to the risk calculation table, what is the consequence of a 'certainty' likelihood?
No injury or loss
Treated by first aid
Specified major injury
Fatality
14
Multiple Choice
What action is recommended for a calculated risk figure between 8 and 15?
Minor, but monitor closely
Significant, immediate control action
Critical, all activities must stop
No action needed
15
Multiple Choice
What is the risk factor for accessing loft space with a ladder according to the document?
6
8
10
12
16
Multiple Choice
Which of the following is a control measure for using a ladder to access loft space?
Use a wooden ladder
Ensure ladder extends sufficiently into loft space
Use a ladder without inspection
Avoid using PPE
17
Multiple Choice
What is the likelihood of an accident from a fall or slip on a freestanding portable ladder?
1
2
3
4
18
Multiple Choice
What is one of the hazards mentioned for accessing loft space with a ladder?
Electrical shock
Slipping and falling
Fire hazard
Chemical exposure
19
Multiple Choice
What is the qualitative method in risk assessment?
It uses numerical values to assess risk.
It divides risks into categories such as low, medium, and high.
It eliminates all risks completely.
It focuses only on financial risks.
20
Multiple Choice
In the risk assessment form, what is the existing measure to control the risk of gas leakage?
Use of fire extinguishers.
System tested before use.
Installation of smoke detectors.
Regular fire drills.
21
Multiple Choice
What action is required if purging of gas leads to a risk of gas in air/LEL lower explosive limit?
No action required.
Immediate evacuation.
No naked flames or switching unless intrinsically safe (IS).
Increase ventilation.
22
Multiple Choice
Who is responsible for using a gas co seeker to search leaks plus leak detection fluid?
Supervisor/Foreman.
Senior gas engineer/Plumber.
Junior apprentice.
Safety officer.
23
Multiple Choice
General Risk Assessment Form for gas work in a boiler room.
Risk Assessment for electrical work in a boiler room.
General Safety Checklist for kitchen appliances.
Fire Safety Assessment for office spaces.
General Risk Assessment Form for gas work in a boiler room.
24
Multiple Choice
What is the purpose of a method statement in a high-risk situation?
To provide a general overview of the work
To prevent accidents or dangerous situations from occurring
To list all possible hazards without solutions
To replace the need for risk assessments
25
Multiple Choice
According to the risk rating calculation, what is the risk level if the likelihood is 1 and the severity is 1?
Low
Medium
High
Critical
26
Multiple Choice
What should a method statement include to be considered suitable?
Only a list of potential hazards
Drawings, plans, specifications, and risk assessments
A brief summary of the work
Only the names of the workers involved
27
Multiple Choice
What is the main purpose of a method statement according to the key term definition?
To provide a checklist for workers
To guide site work and prevent accidents
To replace safety training
To document employee attendance
28
Multiple Choice
What is the purpose of providing a method statement when installing a septic tank?
To ensure the job is completed quickly
To protect workers and the public
To reduce the cost of installation
To avoid using specialist contractors
29
Multiple Choice
Which of the following is included in the details of a method statement?
The color of the equipment
The weather forecast
The scope of the work
The personal preferences of the workers
30
Multiple Choice
What should a method statement include regarding equipment?
The brand of the equipment
Lifting, drilling, and excavation equipment
The cost of the equipment
The color of the equipment
31
Multiple Choice
What is the role of management in the context of a method statement?
To ignore the method statement
To ensure the working methods are followed
To change the method statement frequently
To reduce the number of team meetings
Unit 306 Self study
Part 5
Risk assessment and method statements
Show answer
Auto Play
Slide 1 / 31
SLIDE
Similar Resources on Wayground
24 questions
NOTAM
Presentation
•
Professional Development
24 questions
Using Quizizz for TLA
Presentation
•
Professional Development
25 questions
Instructional Strategies
Presentation
•
Professional Development
22 questions
MAC2 | Vocabulary | L05
Presentation
•
Professional Development
24 questions
Wiingy Tutors: Lesson 1| Wiingy Tutor Portal
Presentation
•
Professional Development
25 questions
UTAR Sharing
Presentation
•
Professional Development
24 questions
Relationships/SEL PD Activity
Presentation
•
Professional Development
24 questions
Teacher Appreciation Breakout 2024
Presentation
•
Professional Development
Popular Resources on Wayground
6 questions
PRIDE Always and Everywhere
Presentation
•
12th Grade
20 questions
Lab Safety Quiz
Quiz
•
6th Grade
26 questions
KOR Review Kahoot Questions
Quiz
•
8th Grade
21 questions
Continents and Oceans
Quiz
•
6th Grade
12 questions
Unit Zero lesson 2 cafeteria
Presentation
•
9th - 12th Grade
20 questions
Parts of Speech
Quiz
•
5th Grade
10 questions
Riddles Riddles fun Riddles
Quiz
•
6th - 12th Grade
16 questions
Subject & Predicate
Quiz
•
5th Grade