16 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A cross section shows what?
Face BWK
Room widths
Roof detail
Foundation detail
2.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
Which tool do you use to set out a 90 degree quoin?
T square
Builders square
Tri square
Builders sqaure
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
1: 5 and 1:50 are used on which drawings?
Detail drawing & elevation
Detail drawing & plan
Cross section & plan
Detail drawing & section
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
We can use a CAT (cable avoidance tool) scanner to locate what before we start our building work?
Existing foundations
Existing services
Existing soil
Clay
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is a building line?
The line from which we set out and is approved by the L.A
A line approved by the HSE
A line approved by your supervisor
The front of the building
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
To what depth do we clear a new site?
100mm
150mm
200mm
225mm
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Why do we carry out "site strip" to a depth of 150mm?
To allow for drainage
To allow for the floor to be layed
To stop vegetation growing back
Cos Darran says so
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?