Unit 102

Unit 102

University

16 Qs

quiz-placeholder

Similar activities

Entrevista Laboral

Entrevista Laboral

University

11 Qs

Evaluación inducción SGSST

Evaluación inducción SGSST

University

12 Qs

Cassandra

Cassandra

University

13 Qs

redemption quiz in anaphy

redemption quiz in anaphy

University

19 Qs

UD4 Seguridad y prevención de accidentes y riesgos laborales en

UD4 Seguridad y prevención de accidentes y riesgos laborales en

5th Grade - University

11 Qs

MODELO PEDAGÓGICO SENA

MODELO PEDAGÓGICO SENA

University

12 Qs

Podróż służbowa

Podróż służbowa

University

15 Qs

Safety

Safety

University - Professional Development

18 Qs

Unit 102

Unit 102

Assessment

Quiz

Professional Development

University

Practice Problem

Medium

Created by

Nick Hodgkiss

Used 28+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

16 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A cross section shows what?

Face BWK
Room widths
Roof detail
Foundation detail

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Which tool do you use to set out a 90 degree quoin?

T square
Builders square
Tri square
Builders sqaure

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1: 5 and 1:50 are used on which drawings?

Detail drawing & elevation
Detail drawing & plan
Cross section & plan
Detail drawing & section

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

We can use a CAT (cable avoidance tool) scanner to locate what before we start our building work?

Existing foundations
Existing services
Existing soil
Clay

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a building line?

The line from which we set out and is approved by the L.A
A line approved by the HSE
A line approved by your supervisor
The front of the building

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To what depth do we clear a new site?

100mm
150mm
200mm
225mm

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why do we carry out "site strip" to a depth of 150mm?

To allow for drainage
To allow for the floor to be layed
To stop vegetation growing back
Cos Darran says so

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?