
UPC Chapters 1-8 Quiz
Other Sciences
12th Grade - University
Used 84+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
49 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
This Document Shall Be Known As The ___.
Uniform Plumbing Code
Universal Plumbing Code
National Plumbing Code
World Plumbing Code
2.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
The definition for the word “stack" does not include ______.
Soil piping
Vent piping
Waste piping
Water piping
3.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
What is "?" ?
Fixture branch
Industrial waste
Indirect waste pipe
Island sink drain
4.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
The Authority Having Jurisdiction shall be notified that work is ready for inspection not less than ___ hours before the work is to be inspected.
72
24
48
12
5.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
It is permitted to drill and tap a vent pipe to connect an indirect waste pipe.
True
False
6.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
Horizontal hubless pipe shall be braced at not more than 40-foot intervals to prevent ______.
Noise
Leaking
Vertical movement
Horizontal movement
7.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
PEX piping may be coupled together with shielded couplings.
True
False
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?