
Applied Codeology - NEC - Article 90 and Article 110
Authored by James Hansmeier
Professional Development
Professional Development
Used 7+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
The NEC covers the installation of electrical conductors, equipment, and raceways; signaling and communications conductors, equipment , and raceways; and optical fiber cables and raceways for all of the following EXCEPT:
Floating Buildings
Underground Mines
Carnivals
Private Premises
2.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
For specific items of equipment and materials referred to in the NEC, examinations for safety made under standard conditions shall be performed by whom?
Authority Having Jurisdiction
Contractor
Qualified Electrical Testing Laboratory
National Aeronautical and Space Administration
3.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
All electrical equipment shall be listed and labeled.
True
False
4.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Listed and labeled equipment shall be installed and used in accordance with any instructions included in the listing or labeling.
True
False
Only if required by the AHJ
Depends on the cost of installation
5.
MULTIPLE SELECT QUESTION
1 min • 1 pt
It is NEVER permissible to intermix conductors of dissimilar metals in a terminal or splicing connector (select all correct answers).
True
False
Only if the device is identified for the purpose and conditions of use.
Prohibited for exterior installations only.
6.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Unless marked otherwise, termination provisions of equipment for circuits rated 100 amperes or less, or marked for 14 AWG through 1 AWG conductors, shall be used only for what temperature rating?
60 degrees C
75 degrees C
90 degrees C
105 degrees C
7.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
While installing a new branch circuit on an existing panel board you notice one of the feeder conductors is marked with orange tape and every other breaker space is open (no circuit breaker is installed). When measuring voltage you get the results pictured. What type of system are you working with?
3-phase, 3-wire, ungrounded delta-connected system
3-phase, 4-wire, wye-connected system
3-phase, 4-wire, delta-connected system
1-phase, 3-wire, delta-connected system
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?
Similar Resources on Wayground
15 questions
Christmas traditions
Quiz
•
Professional Development
8 questions
6035 | Electrical Principles LO3
Quiz
•
Professional Development
10 questions
SYPB & NIKE CATEGORY
Quiz
•
Professional Development
10 questions
PETI EII
Quiz
•
Professional Development
13 questions
Health and Safety
Quiz
•
Professional Development
12 questions
L3 Scientific principles
Quiz
•
Professional Development
15 questions
Vocabulary test related to Peace Article
Quiz
•
Professional Development
15 questions
Personal Effectiveness 4
Quiz
•
Professional Development
Popular Resources on Wayground
7 questions
History of Valentine's Day
Interactive video
•
4th Grade
15 questions
Fractions on a Number Line
Quiz
•
3rd Grade
20 questions
Equivalent Fractions
Quiz
•
3rd Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
22 questions
fractions
Quiz
•
3rd Grade
15 questions
Valentine's Day Trivia
Quiz
•
3rd Grade
20 questions
Main Idea and Details
Quiz
•
5th Grade
20 questions
Context Clues
Quiz
•
6th Grade