Search Header Logo

PT D155A-6R

Authored by Agus Supriyanto

Professional Development

1st Grade

Used 23+ times

PT D155A-6R
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

52 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

2 buah disc dan 3 buah plate digunakan pada 1st clutch speed (Clutch No.5)

BENAR
SALAH

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Power train oil temperature gauge akan masuk ke range merah (overheat) jika temperature-nya mencapai 120oC, sehingga caution lamp menyala dan buzzer berbunyi.

BENAR
SALAH

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Blade lift spool dipasang sebagai 2nd spool pada susunan Hydraulic Main Control Valve.

BENAR
SALAH

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Pada saat during filling (triggering), command current dialirkan maksimal, untuk mempercepat proses filling dan mempertahankan clutch pressure pada initial pressure

BENAR
SALAH

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Type steering brake adalah Wet, multiple disc clutch, springboosted, hydraulic actuation (manual type), brake linkage type.

BENAR
SALAH

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Regulator valve berfungsi untuk membatasi maksimal oil pressure di dalam T/C.

BENAR
SALAH

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Saat sudden turn to right, maka Rh steering clutch akan full disengaged, dan Rh brake full engaged untuk menghilangkan putaran inertia pada Rh track link.

BENAR
SALAH

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?