1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Press line load study is a utilization plan for current capacity of each press performed by _______?
SED
PE
NAMC PC
NAMC QE
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A draft R&R matrix should be sent with the Die Transfer Kick-Off meeting invite.
True
False
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
RCR creation is done by receiving NAMC for _____?
Die Modification
Die Transfer
Both
Neither
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
PPM is responsible to coordinate temporary back up requirement for ______?
Pre-Production and all of Mass Production
Mass-Production Only
All pre-prod (SOP+3 Months), vehicles, and localization parts
5.
MULTIPLE SELECT QUESTION
30 sec • 1 pt
For JPN Prod Models, if a local part is temporarily used instead of the Japan part; ____ leads?
Local PPM
Local PUR
TMC PPM
TMC PUR
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which group is responsible to coordinate the back up parts extension meetings?
PPM
PUR
Plant PC
Design
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which group is responsible for confirming interchangeability by DWG Check?
Plant QE
Design
PUR
PPM
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?