Press line load study is a utilization plan for current capacity of each press performed by _______?

SED

PE

NAMC PC

NAMC QE

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A draft R&R matrix should be sent with the Die Transfer Kick-Off meeting invite.

True

False

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

RCR creation is done by receiving NAMC for _____?

Die Modification

Die Transfer

Both

Neither

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

PPM is responsible to coordinate temporary back up requirement for ______?

Pre-Production and all of Mass Production

Mass-Production Only

All pre-prod (SOP+3 Months), vehicles, and localization parts

5.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

For JPN Prod Models, if a local part is temporarily used instead of the Japan part; ____ leads?

Local PPM

Local PUR

TMC PPM

TMC PUR

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which group is responsible to coordinate the back up parts extension meetings?

PPM

PUR

Plant PC

Design

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which group is responsible for confirming interchangeability by DWG Check?

Plant QE

Design

PUR

PPM

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?