Pop Quiz - Intro to Construction Measurement

Pop Quiz - Intro to Construction Measurement

University

10 Qs

quiz-placeholder

Similar activities

Equipment and Excavation Works

Equipment and Excavation Works

University

15 Qs

TUNNEL AND EARTH DAM (GROUP 4)

TUNNEL AND EARTH DAM (GROUP 4)

University

15 Qs

AIRe HSE Quiz June 2022

AIRe HSE Quiz June 2022

University - Professional Development

10 Qs

Estimating is fun

Estimating is fun

University

15 Qs

Philosophical Chairs

Philosophical Chairs

KG - University

15 Qs

Lecture 3a - Roadworks and Pavement

Lecture 3a - Roadworks and Pavement

University

10 Qs

Tunnel in Soft Ground

Tunnel in Soft Ground

University

15 Qs

Topic 3: Site Clearance & Earthworks

Topic 3: Site Clearance & Earthworks

University

10 Qs

Pop Quiz - Intro to Construction Measurement

Pop Quiz - Intro to Construction Measurement

Assessment

Quiz

Other

University

Hard

Created by

Mohamad Ramly Zuhaili

Used 15+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Media Image

What is the INTERVAL of class depth classification for the depth which exceeds 4.00m?

0.25m

1.00m

2.00m

4.00m

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Media Image

What is the Unit of Measurement (UoM) for basement excavation works?

M

M2

M2 stating the thickness

M3

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Media Image

Which clause of SMM2 described the provision of stating the "dimension on plan" of the excavation works?

Clause D.10

Clause D.12.2

Clause D.12.6

Clause D.12.8

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Media Image

Which of the following item is "NOT" measured as an "Extra Over"?

Excavation to receive services piping

Excavation around services piping

Breaking up concrete on surface excavation

Breaking up concrete met within excavation

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Media Image

What is the Unit of Measurement (UoM) an excavation works around/across the services pipe(s)?

M

M, stating as Extra Over

No

No, stating as Extra Over

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Media Image

The followings must be described in the description of excavation works alongside the service pipes, EXCLUDING

Starting level

Size of the service pipe(s)

Type of the service pipe(s)

Radius of the service pipe(s)

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Media Image

Which of the following clause stating the requirement of the "radius of excavation"?

Clause D.12.2

Clause D.12.3

Clause D.12.12

Clause D.12.13

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?