1.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
What is the INTERVAL of class depth classification for the depth which exceeds 4.00m?
0.25m
1.00m
2.00m
4.00m
2.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
What is the Unit of Measurement (UoM) for basement excavation works?
M
M2
M2 stating the thickness
M3
3.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Which clause of SMM2 described the provision of stating the "dimension on plan" of the excavation works?
Clause D.10
Clause D.12.2
Clause D.12.6
Clause D.12.8
4.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Which of the following item is "NOT" measured as an "Extra Over"?
Excavation to receive services piping
Excavation around services piping
Breaking up concrete on surface excavation
Breaking up concrete met within excavation
5.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
What is the Unit of Measurement (UoM) an excavation works around/across the services pipe(s)?
M
M, stating as Extra Over
No
No, stating as Extra Over
6.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
The followings must be described in the description of excavation works alongside the service pipes, EXCLUDING
Starting level
Size of the service pipe(s)
Type of the service pipe(s)
Radius of the service pipe(s)
7.
MULTIPLE CHOICE QUESTION
1 min • 1 pt
Which of the following clause stating the requirement of the "radius of excavation"?
Clause D.12.2
Clause D.12.3
Clause D.12.12
Clause D.12.13
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?