Level 3 phase 1 central heating questions

Level 3 phase 1 central heating questions

Professional Development

10 Qs

quiz-placeholder

Similar activities

Pivot Tables

Pivot Tables

Professional Development

10 Qs

Design Basics of Substation  engineering

Design Basics of Substation engineering

Professional Development

10 Qs

Trg@home 1

Trg@home 1

Professional Development

10 Qs

Pre and Post Test

Pre and Post Test

Professional Development

10 Qs

Pre & Post Test QCC

Pre & Post Test QCC

Professional Development

10 Qs

Microsoft 365

Microsoft 365

Professional Development

11 Qs

Peran Pendidikan Tinggi di Era Revolusi Industri 4.0

Peran Pendidikan Tinggi di Era Revolusi Industri 4.0

Professional Development

10 Qs

SLS PS 2.0 Types of Learning Experiences (LE)

SLS PS 2.0 Types of Learning Experiences (LE)

Professional Development

10 Qs

Level 3 phase 1 central heating questions

Level 3 phase 1 central heating questions

Assessment

Quiz

Professional Development

Professional Development

Medium

Used 165+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What heating system uses a difference in the density of water to circulate heat to a hot water cylinder?

Y plan

Gravity fed

S plan+

Hypocaust

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The conservation of fuel and energy is covered by which approved document?

Building regulations part P

Building regulations part M

Building regulations part H

Building regulations part L

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main purpose of a central heating system?

To heat up the core of the building

To provide thermal comfort to a property

To supply heating to a single room

To provide heat to a number of properties

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is at the highest point of a vented heating system?

Expansion vessel

Feed and expansion cistern

Cold feed isolation valve

Automatic air vent

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary function of the open vent on a central heating system?

To allow the system to pressurise

To allow the system to operate at atmospheric pressure

To provide sufficient oxygen to the heating system

To provide a means of ventilation when filling the system

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. What type of heating system incorporates a three-port valve that gives priority to the hot water system?

Y plan

S plan

S plan+

W plan

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. What three components are required when converting an open vented system with a sealed system?

Automatic air vent, low loss header, filling loop

Filling loop, expansion vessel, pressure gauge

Pressure relief valve, filling loop, expansion vessel

Expansion vessel, automatic air vent, pressure gauge

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?