1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is not a phase of project management?
Project planning
Project scheduling
Project controlling
project being
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A PERT network is activity-oriented while a CPM network is event-oriented
True
false
cant say
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
_________ are used to represent activity in a network diagram.
circle
square
Rectangle
arrow
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The shortest possible time in which an activity can be achieved under ideal circumstances is known as ________
a) Pessimistic time estimate
b) Optimistic time estimate
c) Expected time estimate
d) The most likely time estimate
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
According to the time estimates made by the PERT planners, the maximum time that would be needed to complete an activity is called as __________
a) The most likely time estimate
b) Optimistic time estimate
c) Pessimistic time estimate
d) Expected time estimate
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The difference between the maximum time available and the actual time needed to perform an activity is known as _________
a) Free float
b) Independent float
c) Total float
d) Slack
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which statistical distribution is assumed by simplified PERT
beta
normal
poisson
binomial
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?