Inspection and Testing Sample questions

Inspection and Testing Sample questions

1st - 12th Grade

20 Qs

quiz-placeholder

Similar activities

Electricity Basics

Electricity Basics

11th Grade - University

20 Qs

Lesson 4 Process control loop Basics  - Understanding Ohm's Law

Lesson 4 Process control loop Basics - Understanding Ohm's Law

9th - 12th Grade

15 Qs

1 - les bases théoriques de l'électricité

1 - les bases théoriques de l'électricité

1st Grade

16 Qs

2melec test

2melec test

2nd Grade

20 Qs

Ham Radio Extra Questions Till 2020 Set E5C

Ham Radio Extra Questions Till 2020 Set E5C

KG - Professional Development

17 Qs

ET Trade Specific

ET Trade Specific

8th Grade

20 Qs

Electrical Materials

Electrical Materials

9th Grade

20 Qs

7th Grade PLTW Electronics Key Term Quiz

7th Grade PLTW Electronics Key Term Quiz

7th Grade

20 Qs

Inspection and Testing Sample questions

Inspection and Testing Sample questions

Assessment

Quiz

Specialty

1st - 12th Grade

Medium

Created by

Chris Falet

Used 144+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

1. The non-statutory document that is applicable to the probes and leads of test equipment is:

a. HSE Guidance Note GS 38

b. BS7671

c. The IET On Site Guide

d. IET Guidance Note 3.

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

The following tests may be carried out on a new installation:

1. polarity

2. insulation resistance

3. ring final circuit continuity

4. cpc continuity.

The relevant test in the correct sequence for a new ring final circuit are:

a. 2,1,4

b. 1,2,4,3

c. 3,1,2

d. 3,2,1.

3.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

3. If the length of a cable is doubled the insulation resistance will be:

a. quartered

b. halved

c. remain the same

d. doubled.

4.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

4. If the length of a cable is doubled the resistance will be:

a. quartered

b. halved

c. remain the same

d. doubled.

5.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

5. When carrying out an initial verification, a check for polarity is carried out when energising of the installation for the first time. This is to confirm:

a. correct connection of the incoming supply

b. correct connection of equipment

c. operation of the main isolator

d. operation of the supply fuse.

6.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

6. A continuity of protective conductors test is carried out using a:

a. continuity tester

b. low reading ohmmeter

c. low resistance ohmmeter

d. insulation tester.

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

7. An increase in conductor operating temperature will result in:

a. an decrease in conductor resistance

b. an increase in conductor resistance

c. an increase in insulation resistance

d. no apparent change in resistance or insulation resistance.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?