Inspection and Testing Sample questions

Inspection and Testing Sample questions

1st - 12th Grade

20 Qs

quiz-placeholder

Similar activities

CANADA'S WONDERLAND ROLLER COASTERS

CANADA'S WONDERLAND ROLLER COASTERS

2nd - 6th Grade

15 Qs

ORACIONES INCOMPLETAS

ORACIONES INCOMPLETAS

1st - 4th Grade

20 Qs

MSDGN CHAPITRE 12 STMG

MSDGN CHAPITRE 12 STMG

1st Grade - University

20 Qs

1 STMG Evaluation Thème 3

1 STMG Evaluation Thème 3

1st Grade

20 Qs

Why not explore more Serving Community

Why not explore more Serving Community

8th Grade

20 Qs

[CBTC28] - QUẢN LÝ TÀI CHÍNH & ĐIỀU HÀNH CUỘC HỌP

[CBTC28] - QUẢN LÝ TÀI CHÍNH & ĐIỀU HÀNH CUỘC HỌP

KG - Professional Development

20 Qs

Auto Tech

Auto Tech

10th Grade

18 Qs

Inspection and Testing Sample questions

Inspection and Testing Sample questions

Assessment

Quiz

Specialty

1st - 12th Grade

Medium

Created by

Chris Falet

Used 144+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

1. The non-statutory document that is applicable to the probes and leads of test equipment is:

a. HSE Guidance Note GS 38

b. BS7671

c. The IET On Site Guide

d. IET Guidance Note 3.

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

The following tests may be carried out on a new installation:

1. polarity

2. insulation resistance

3. ring final circuit continuity

4. cpc continuity.

The relevant test in the correct sequence for a new ring final circuit are:

a. 2,1,4

b. 1,2,4,3

c. 3,1,2

d. 3,2,1.

3.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

3. If the length of a cable is doubled the insulation resistance will be:

a. quartered

b. halved

c. remain the same

d. doubled.

4.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

4. If the length of a cable is doubled the resistance will be:

a. quartered

b. halved

c. remain the same

d. doubled.

5.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

5. When carrying out an initial verification, a check for polarity is carried out when energising of the installation for the first time. This is to confirm:

a. correct connection of the incoming supply

b. correct connection of equipment

c. operation of the main isolator

d. operation of the supply fuse.

6.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

6. A continuity of protective conductors test is carried out using a:

a. continuity tester

b. low reading ohmmeter

c. low resistance ohmmeter

d. insulation tester.

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

7. An increase in conductor operating temperature will result in:

a. an decrease in conductor resistance

b. an increase in conductor resistance

c. an increase in insulation resistance

d. no apparent change in resistance or insulation resistance.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?