Construction Information,Drawings and symbols.
Authored by Kevin Etchells
Instructional Technology
10th Grade
Used 77+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
26 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The drawing shown would be known as?
a Component Range drawing.
an Elevation drawing.
a Plan drawing.
a Block plan.
Answer explanation
The drawing shown would be known as an Elevation drawing because it shows the vertical view of an object or structure.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A Block plan drawing would usually be produced to which of the following scale ratio's?
1:100
1:500
1:2500
1:10
Answer explanation
A Block plan drawing is usually produced to a scale ratio of 1:500, making it the correct choice among the given options.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The British Standard code for drawings is;
BS1969
BS1192
BS1945
BS1066
Answer explanation
The correct British Standard code for drawings is BS1192, as it is the most widely used standard for architectural and engineering drawings in the UK.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The sign shown is the sign to show a what?
Boundary
Datum
Ley line
Horizon.
Answer explanation
The sign shown is the sign to show a Datum, not a Boundary, Ley line, or Horizon. Datum is the correct choice for this sign.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When you see this sign on a drawing which direction is it identifying?
South
West
North
East
Answer explanation
The sign indicates North direction on a drawing.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which member of the building team will prepare a Bill of Quantities?
The Project Manager.
The Quantity Surveyor
The Site Engineer.
The Clerk of Works.
Answer explanation
The Quantity Surveyor is responsible for preparing a Bill of Quantities.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When an operative receives a delivery on site which document must be checked prior to the delivery being accepted?
The Manufacturers Instructions.
The Delivery Note.
The Bill of Quantities.
The Specification.
Answer explanation
The Delivery Note must be checked prior to the delivery being accepted, ensuring all items are accounted for and in good condition.
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?