Search Header Logo

OREDE-P RGTSU OPERATIONAL OVERVIEW

Authored by Nur Deyana

Professional Development

Professional Development

Used 8+ times

OREDE-P RGTSU OPERATIONAL OVERVIEW
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

LNG Stand for :

Liquefied normal gas

Liquefied natural gas

Light natural gas

Liquid natural gas

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is normal design capacity for sent out RGTSU?

450 mmscfd

555 mmscfd

500 mmscfd

600 mmscfd

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Listed are LNG Unloading System, EXCEPT:

LNG Unloading from LNGC

LNG Loading to FSU’s

BOG Return to LNGC

BOG Header

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

LNG regasification terminal includes the following systems, EXCEPT :

BOG Recovery System

LNG Unloading System

LNG Sent Out System

LNG Trucking facilities

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many utility system install at RGTSU

9

10

8

11

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the equipment that will be utilize to compress excess BOG?

Vaporizer

Recondenser

BOG Compressor

Metering

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the distance between RGTSU island berth to onshore?

1 kilometers

2 kilometers

3 kilometers

4 kilometers

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Discover more resources for Professional Development