OREDE-P RGTSU LNG SEND OUT SYSTEM

OREDE-P RGTSU LNG SEND OUT SYSTEM

Assessment

Quiz

Created by

Nur Deyana

Professional Development

Professional Development

8 plays

Medium

Student preview

quiz-placeholder

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the size of LNG send out header?

10"

11"

12”

16"

2.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Which are the system that support the loading arm ?


You may tick more than one answer

Mechanical Jack

Hand Pump

Control Panel

Hydraulic Power Unit

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the operating pressure range at LP send out arm?

2.8 - 3.0 bard

2.8 - 3.8 barg

2.5 - 3.0 barg

2.5 – 3.8 barg

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the system involve during emergency of loading arm?

PERC

ERS

PERC and ERS

PERB AND ERT

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Loading arm can be maneuvers by control devise below, EXCEPT :

Local control panel

Radio

Pendant

Control Room

6.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Select THREE parameter that panel operator need to monitor during loading activities

Quantity of discharging

Rate of loading

Loading Arm Pressure

Line Temperature

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the parameter that control level of LP suction drum?

All answer

Flow

Temperature

Pressure