What is the size of LNG send out header?
10"
11"
12”
16"
2.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
Which are the system that support the loading arm ?
You may tick more than one answer
Mechanical Jack
Hand Pump
Control Panel
Hydraulic Power Unit
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the operating pressure range at LP send out arm?
2.8 - 3.0 bard
2.8 - 3.8 barg
2.5 - 3.0 barg
2.5 – 3.8 barg
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the system involve during emergency of loading arm?
PERC
ERS
PERC and ERS
PERB AND ERT
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Loading arm can be maneuvers by control devise below, EXCEPT :
Local control panel
Radio
Pendant
Control Room
6.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
Select THREE parameter that panel operator need to monitor during loading activities
Quantity of discharging
Rate of loading
Loading Arm Pressure
Line Temperature
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the parameter that control level of LP suction drum?
All answer
Flow
Temperature
Pressure
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?