OREDE-P RGTSU LNG SEND OUT SYSTEM

Authored by Nur Deyana

Professional Development

Professional Development

Used 8+ times

OREDE-P RGTSU LNG SEND OUT SYSTEM
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the size of LNG send out header?

10"

11"

12”

16"

2.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Which are the system that support the loading arm ?


You may tick more than one answer

Mechanical Jack

Hand Pump

Control Panel

Hydraulic Power Unit

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the operating pressure range at LP send out arm?

2.8 - 3.0 bard

2.8 - 3.8 barg

2.5 - 3.0 barg

2.5 – 3.8 barg

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the system involve during emergency of loading arm?

PERC

ERS

PERC and ERS

PERB AND ERT

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Loading arm can be maneuvers by control devise below, EXCEPT :

Local control panel

Radio

Pendant

Control Room

6.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Select THREE parameter that panel operator need to monitor during loading activities

Quantity of discharging

Rate of loading

Loading Arm Pressure

Line Temperature

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the parameter that control level of LP suction drum?

All answer

Flow

Temperature

Pressure

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?