OREDE-P RGTP Unit 10: Jetty Berth

OREDE-P RGTP Unit 10: Jetty Berth

Professional Development

5 Qs

quiz-placeholder

Similar activities

Supernatural Quiz

Supernatural Quiz

5th Grade - Professional Development

8 Qs

Cooling Systems (1) Quiz

Cooling Systems (1) Quiz

Professional Development

10 Qs

Generating and Transporting Electricity

Generating and Transporting Electricity

5th Grade - Professional Development

10 Qs

Elementary Particles

Elementary Particles

7th Grade - Professional Development

10 Qs

Mid term exam practice quiz

Mid term exam practice quiz

KG - Professional Development

10 Qs

Buoyancy Basics

Buoyancy Basics

Professional Development

10 Qs

Body Language

Body Language

Professional Development

9 Qs

ROUND 3

ROUND 3

10th Grade - Professional Development

10 Qs

OREDE-P RGTP Unit 10: Jetty Berth

OREDE-P RGTP Unit 10: Jetty Berth

Assessment

Quiz

Physics

Professional Development

Medium

Created by

faris shakir

Used 4+ times

FREE Resource

5 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

List out loading arms at RGTP

2 Liquid Arms, 1 Hybrid Arm, and 1 Vapor Arms

3 Liquid Arms, 1 Hybrid Arm, and 1 Vapor Arms

2 Liquid Arms, 2 Hybrid Arms, and 1 Vapor Arms

2 Liquid Arms, 1 Hybrid Arm and 2 Vapor Arms

2.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

All theses are Unloading/Reloading components EXCEPT

Emergency Respond Tools

Hydraulic PowerUnit (HPU)

Temperature Control Valve

Powered Emergency Release Coupler (PERC)

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

List out the type of swivel joint for Loading/Reloading Arms at RGTP

Style 50, 60 and 70

Style 50, 40 and 80

Style 55, 65 and 75

Style 55, 45 and 85

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main function of the Quick Connect/Disconnect Coupler?

Provides the means of connecting and disconnecting the loading arm to the tanker manifold flange without the need for nuts and bolts

Provides the warning bell rings and signal lamp on during an emergency.

Remove any particles during the transfer operation between LNGC and LNG Storage Tanks

Controls the position and angle of the ladder while moving up and down on the tower within the breadth of the guide rail

5.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Gangway Tower (A-1001) has provided access from the shore to LNGC. List out the components A-1001?


You may choose one or more answer

Guide Rail and Jib Crane

Lifter and Bulwark Ladder

Turntable and Telescopic Ladder