
EP for CE only
Authored by James Chia
Education
Professional Development
Used 12+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
15 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
SS638 is categorized into _____ different parts.
6
7
8
9
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Electrician is entitled to design electrical supplies up to _______ kVA.
35
40
45
60
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which one is the following is NOT a primary function of a Power System?
Waste
Supply
Transfer
Use
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which one is the correct sequence of the Power system?
Power Station, Transformer, Substation, User
Transformer, Substation, User, Power station
Substation, User, Power station, Transformer
User, Power station, Transformer, Substation
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In Circuit Theory Analysis, an electrical network can be complicated and we have to apply different methods to ________ the network for determining the electrical parameters.
Differentiate
Calculate
Simplify
Expand
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In Circuit Theory Analysis, the line represents the circuit components is called the _______ of a network.
path
extension
node
branch
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is a form of design of a transformer?
Shell
Shunt
Series
Cover
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?