What are the DA facility equipments installed in MRMU substation?
RTU
RCB
EFI
All of the above
2.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
What is the cable specification for grounding cable?
1 core, 6 mm2, non-armoured
4 core, 1 mm2, non-armoured
2 core, 4 mm2, armoured
1 core, 6 mm2, armoured
3.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
Which statement is NOT true regarding MRMU Multipin?
Multipin plug in connector has 19 core
Transformer feeder can be controlled by SCADA
MRMU Multipin also known as MRMU Remote-Local
Earth switch can be controlled by SCADA
4.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
What type of cable is this?
AC cable
I/O cable
Multipin cable
DC cable
5.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
What is the purpose of RCB?
To detect earth fault
Provide safer switching method for AP
To transmit and receive data to Master System
Act as a communication medium
6.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
What is the test carried out during shutdown for PIW MRMU?
Factory acceptance test (FAT)
Primary injection test
Site acceptance test (SAT)
Insulation resistance test
7.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
What type of RCB is this?
RCB Multipin
RCB Conventional
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?