1.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

What are the Vehicle Prototype (VP) requirements?, select all applicable.

Confirmation of Tool Readiness

Parts produced from hard tools

SCA stage 1 conducted

DCP confirmed

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Parts PO will be released and received before VP build

True

False

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is not a Technical Documentation?

SC-CC / Consequence class defined

Material Specification

DCP

Technical Regulations (TR)

Drawing and Measuring Point (MP) Drawing ready

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The objective with the Dimensional Control Plan is to analyze capability during pre-production and to secure capability in running production

True

False

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Gauges should be ready and available to measure parts for delivery to VP MRD

True

False

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Dimensional study should be performed with serial tooling by VP event

True

False

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Suppliers should have CM4D software installed

True

False

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?