1.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
What are the Vehicle Prototype (VP) requirements?, select all applicable.
Confirmation of Tool Readiness
Parts produced from hard tools
SCA stage 1 conducted
DCP confirmed
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Parts PO will be released and received before VP build
True
False
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is not a Technical Documentation?
SC-CC / Consequence class defined
Material Specification
DCP
Technical Regulations (TR)
Drawing and Measuring Point (MP) Drawing ready
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The objective with the Dimensional Control Plan is to analyze capability during pre-production and to secure capability in running production
True
False
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Gauges should be ready and available to measure parts for delivery to VP MRD
True
False
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Dimensional study should be performed with serial tooling by VP event
True
False
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Suppliers should have CM4D software installed
True
False
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?