FILL IN THE BLANKS QUESTION
45 sec • 1 pt
What does SMV stand for ?
(a)
2.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
What is not a benefit of Method Study ?
Improve Productivity
Increase resource utilization
Establish SMV taken for method
Reduce fatigue of operator
3.
MULTIPLE CHOICE QUESTION
2 mins • 1 pt
Calculate SMV for this operation
Avg: Observed time = 0.5
Avg: Observed rating = 70
Allowance = 15 %
0.20
0.35
0.402
5.25
4.
MULTIPLE CHOICE QUESTION
45 sec • 1 pt
What is not a reason for a SMV change?
Construction changes
Method of doing operation
Machine type
None of the above
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How many codes are there in first level handling category in GSD?
07
29
25
11
6.
MULTIPLE CHOICE QUESTION
3 mins • 1 pt
Calculate the efficiency of the line, if:
Hourly output – 500 pcs
SMV for the garment – 3.45
Number of Operators – 10
Working Time – 8hrs
35.93%
21.56%
43.98%
62.03%
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?