1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

All of the following are tools of Control Quality, EXCEPT: (10 points)

Cost quality

 Inspection

Control Charts

Flowcharting

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The purpose of fishbone diagram is to: (10 points)

Show how a process or system flows from beginning to end

Simulate thinking, organize thoughts, and generate discussion

Determine the organization of the project

Show fundamental responsbilities and how they are related to one another and to the objectives of the project

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

During project executing, a major problem occurs that was not included in the risk register. What should you do FIRTS? (10 points)

Create a workaround

Reevaluate and identify risks process

Look for any unexpected effects of the problem

Tell management

4.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

After identifying a risk to you project, you determine that there is a high probability of the risk occurring, but its consequences are low. Which mitigation strategy would be BEST to adopt in this case? (10 points)

Eliminate the consequence of the risk

Avoid the risk

Add the risk to the watch list

Insure against the risk

5.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Workarounds are determined during which risk management process? (10 points)

Identify risks

Perform quantity risk analysis

Plan risk responses

Control risks

6.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Which of the following is not included in the risk register as an output of Identify Risks? (10 points)

List of risk owners

List of potential risk responses

The root cause of the risks

List of risks

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

In the stakeholder management knowledge area, change request, corrective actions, and lesson learned are MOST likely to be the output of which process? (10 points)

Plan stakeholder management and manage stakeholder engangement

Control scope and develop project team

Manage stakeholder engagement and control stakeholder engangement

Plan stakeholder management and control stakeholder management

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?