18th Edition appendices mock 1

18th Edition appendices mock 1

Professional Development

10 Qs

quiz-placeholder

Similar activities

WIN Competition 2022

WIN Competition 2022

Professional Development

8 Qs

18th Edition Part 6 Mock 2

18th Edition Part 6 Mock 2

Professional Development

10 Qs

CARVERY INDUCTION session 1

CARVERY INDUCTION session 1

Professional Development

11 Qs

Sanitation System Quiz PT1

Sanitation System Quiz PT1

Professional Development

10 Qs

BTS

BTS

Professional Development

11 Qs

TEST UỐN VÁN

TEST UỐN VÁN

Professional Development

10 Qs

18th Edition appendices mock 2

18th Edition appendices mock 2

Professional Development

10 Qs

18th edition part 2 mock 2

18th edition part 2 mock 2

Professional Development

10 Qs

18th Edition appendices mock 1

18th Edition appendices mock 1

Assessment

Quiz

Other

Professional Development

Hard

Created by

Gareth Wyatt

Used 9+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

A circuit uses a 45-amp BS 88-3 cartridge fuse as a means of protection, what is the tabulated disconnection time for an overcurrent of 550 amps?
a)        0.1 second
b)        0.2 second
c)        0.4 second
d)        1.0 second

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Which BS standard covers ceiling roses?
a)         BS 5655
b)            BS 67
c)              BS EN 81
d)         BS EN 50438

3.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Which is the principal organisation responsible for 'Distributors Installations' in the UK?
a)             The heaIth and safety executive
b)             The local authority organisation
c)             The department for innovation and skills
d)            The home department

4.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

The group rating factor for a group of five different sized sheathed cables is?
a) 0.325
b) 0.447
c) 0.528
d) 0.632

5.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

With reference to energy efficiency systems, on-site renewable energy sources?
a)     Increase the efficiency of an electrical installation
b)      Reduce the efficiency of an electrical installation
c)      Reduce the overall public electricity network losses
d)     May be considered a direct energy efficiency measure

6.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

When measuring the prospective fault current in a three-phase installation the highest prospective fault current will occur?
a)      When a short circuit develops between a line and neutral conductor
b)      When a short circuit develops between a line and earth conductor
c)      When a short circuit develops between two-line conductors
d)     When a short circuit develops simultaneously between all line conductors

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

With reference to AC motors used within an energy efficiency system, what method can be used to achieve higher energy efficiency?
a)     Install less powerful motors
b)     Install more powerful motors
c)     Install variable speed drives
d)     Install fixed speed drives

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?